GE Energy’s Industrial Solutions business unveiled its new ecomagination-approved WattStation and WattStation Connect.
An electric vehicle (EV) charging station and software platform, the solution allows WattStation owners to manage charging stations remotely, giving them the ability to manage and set customer pricing for EV charging, provide access control at their facilities, generate valuable reports and engage with customers in new ways.
Now available, GE’s WattStation pedestal EV charger is easy to use, customizable and features a retractable cord.
The WattStation Connect full-service software platform helps meet a wide variety of EV needs, whether it is a retailer looking to attract new customers, a commercial property manager in need of information on electricity usage or a fleet owner in search of better cost-allocation data. WattStation Connect provides owners a user-friendly method to manage, monitor and maintain their EV charging ecosystem network.
Industrial Solutions is forming data acquisition agreements with key navigation companies to share information on the installations and availability of WattStations throughout the U.S. and Canada. This enables EV drivers to view and locate GE’s WattStations, obtain directions to the EV charging stations, access pricing details and determine whether a unit is available for charging. In addition to global positioning systems, the GE WattStation Connect data will be available through the Internet, mobile app/device and future in-vehicle systems.
GE Energy’s Industrial Solutions business is working with a well-known online payment company to enable drivers to safely and conveniently pay for charging fees through the WattStation Connect mobile app. The app will be available for download in the coming weeks. EV drivers can use the mobile app to scan the quick response (QR) barcode on the WattStation charger. The QR code will identify the station and the pricing structure for that individual charger. BD+C
Related Stories
| Jan 7, 2011
How Building Teams Choose Roofing Systems
A roofing survey emailed to a representative sample of BD+C’s subscriber list revealed such key findings as: Respondents named metal (56%) and EPDM (50%) as the roofing systems they (or their firms) employed most in projects. Also, new construction and retrofits were fairly evenly split among respondents’ roofing-related projects over the last couple of years.
| Jan 4, 2011
Product of the Week: Zinc cladding helps border crossing blend in with surroundings
Zinc panels provide natural-looking, durable cladding for an administrative building and toll canopies at the newly expanded Queenstown Plaza U.S.-Canada border crossing at the Niagara Gorge. Toronto’s Moriyama & Teshima Architects chose the zinc alloy panels for their ability to blend with the structures’ scenic surroundings, as well as for their low maintenance and sustainable qualities. The structures incorporate 14,000 sf of Rheinzink’s branded Angled Standing Seam and Reveal Panels in graphite gray.
| Jan 4, 2011
Furniture Sustainability Standard - Approved by ANSI and Released for Distribution
BIFMA International recently announced formal American National Standards Institute (ANSI) approval and release of the ANSI/BIFMA e3-2010 Furniture Sustainability Standard. The e3 standard represents a structured methodology to evaluate the "sustainable" attributes of furniture products and constitutes the technical criteria of the level product certification program.
| Dec 7, 2010
Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices
IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.
| Nov 2, 2010
A Look Back at the Navy’s First LEED Gold
Building Design+Construction takes a retrospective tour of a pace-setting LEED project.
| Nov 2, 2010
Wind Power, Windy City-style
Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.