A Houston project plans to achieve two firsts: the city’s first mass timber commercial office project, and the state of Texas’s first commercial office building targeting net zero energy operational carbon upon completion next year. Framework @ Block 10 is owned and managed by Hicks Ventures, a Houston-based development company.
Located in Houston’s Memorial City district, the six-floor, 200,000-sf office building will be built with sustainably sourced heavy timber. Because of mass timber’s carbon-storage capability, the building will save more than 60% of greenhouse gas emissions, and it will achieve 100% reduction in outdoor potable municipal water consumption and more than 50% reduction in indoor potable municipal water consumption, Hicks Ventures says.
Designed by Gensler, with mass timber design and engineering by StructureCraft, Framework @ Block 10 will comprise dowel laminated timber (DLT) floor and roof panels supported by glulam post and beam framing designed to showcase the wood’s beauty and efficiency. A rainwater harvesting cistern, full roof solar panels, LED lighting, and a sensory system will help reduce wasteful energy use. The building design targets LEED Platinum certification, WiredScore Platinum, and WELL Platinum building standards.
Design and smart building features include an accessible dashboard showing up-to-date information on the building’s energy consumption, indoor air quality and ventilation sensors, an underfloor air distribution system, complete tenant control of environment-based responsiveness to available metrics, 10-foot ultra-high-efficiency vision glass panels, ceiling heights of 11.5 feet, and shared, spacious balconies on each floor. In addition, 5,000 sf of ground-level space will be available for a future restaurant partner.
Framework @ Block 10’s groundbreaking is slated for later this year, with completion scheduled for late 2024.
On the Building Team:
Developer: Hicks Ventures
Design architect and sustainability team: Gensler
Mass timber design and engineering: StructureCraft
MEP engineer: CMTA
General contractor: HOAR Construction

Related Stories
Mass Timber | Jan 11, 2022
As trends shift toward mass timber, AEC firms are watching the demand curve
Swinerton’s New York office expects its first projects to be luxury residential.
Mass Timber | Nov 28, 2021
Henning Larsen reveals design for large-scale timber building
The project is located in Copenhagen.
Sponsored | Mass Timber | Nov 17, 2021
Mass Timber Brings Warmth, Flexibility to Commercial Building
Design visionaries are creating game-changing commercial facilities with mass timber. Discover how to use mass timber in your next project.
Mass Timber | Nov 5, 2021
Large-scale mass timber office building completes in Kirkland, Wash.
LMN Architects designed the building.
Mass Timber | Nov 1, 2021
A new mixed-used building in L.A. could set the stage for greater mass timber use for western construction
Part of a trend that’s seeing CLT gain acceptance for bigger projects across the country.
Sponsored | BD+C University Course | Oct 15, 2021
7 game-changing trends in structural engineering
Here are seven key areas where innovation in structural engineering is driving evolution.
| Oct 14, 2021
The future of mass timber construction, with Swinerton's Timberlab
In this exclusive for HorizonTV, BD+C's John Caulfield sat down with three Timberlab leaders to discuss the launch of the firm and what factors will lead to greater mass timber demand.
Mass Timber | Oct 5, 2021
KPF’s first hybrid mass timber project set to rise in Vancouver
The project will be built in the Bentall Centre campus.