flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Georgia Southern’s new $60 million Engineering and Research Building completes

University Buildings

Georgia Southern’s new $60 million Engineering and Research Building completes

The facility will serve as the new epicenter for engineering excellence and innovation in southeast Georgia.


By David Malone, Associate Editor | June 1, 2021
Georgia Southern Research and Engineering Building exterior

Photos Courtesy JE Dunn

Georgia Southern’s new $60 million, 140,625-sf Engineering and Research Building has completed construction. The building was designed to facilitate academic and institutional partnerships, inspire creative engineering, and accelerate academic success for students in the College of Engineering and Computing.

The new facility centralizes various departments and multiple disciplines whose activities previously took place in three buildings. The building will enhance the university’s research capabilities as well as opportunities for faculty to engage students in hands-on research and teaching projects.

Applied research spaces with a strong focus on manufacturing engineering, civil engineering, electrical and computer engineering, and mechanical engineering are all housed in the three-story building. Workspaces can be easily reconfigured for various uses, projects, and applications while also providing students with access to industry-grade equipment and expanded opportunities for undergraduate research.

 

Georgia Southern High Bay overlook interior

 

In total the building houses more than 35 labs including robotics and automated manufacturing labs, a traditional and CNC finishing lab, a materials science and characterization lab, an industrial instrumentation and controls lab, a joining and welding lab, and a renewable energy roof deck lab (solar, wind, weather). Metal and non-metal 3D-printing spaces are also included.

The building also includes one of the Southeast’s only Class 3 cleanrooms, which is necessary for manufacturing or scientific research that requires and environment with very low levels of pollutants such as dust, microbes, vapors, or aerosol particles.

21 research spaces, six classrooms, four conference rooms, 27 offices, and a 1,500-sf colloquium space with a 500-sf balcony are also included.

SmithGroup was the project architect. JE Dunn Construction built the facility.

Related Stories

Giants 400 | Aug 13, 2019

2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings

The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.

University Buildings | Aug 8, 2019

New Student Wellness Center at the University of Chicago begins construction

Wight & Company is providing design-build services for the project.

University Buildings | Jul 10, 2019

Campus costs: Square foot construction prices for student unions

Using RSMeans data from Gordian, here are the most recent costs per square foot of college student unions in 10 college cities across the U.S. 

University Buildings | Jul 3, 2019

Duke’s new Chinese campus sits atop a manmade lake

Gensler and LandDesign designed the project.

University Buildings | Jul 2, 2019

New Biomedical Research Center Facility at Northwestern University

Designed by Perkins+Will, the Louis A. Simpson and Kimberly K. Querrey Biomedical Research Center has spaces aiding medical discovery.

Contractors | Jun 15, 2019

Turner tops off new classroom space at Middle Tennessee State University

The building includes a “command center” for training students to interact with emergency personnel.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021