flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Giants 300 Science & Technology Report

Giants 300 Science & Technology Report

BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.


By Posted by Tim Gregorski, Senior Editor | August 8, 2012
Building Team: DGA Builders (CM), Bergmann Associates (EA), Kennedy Mechanical (
Building Team: DGA Builders (CM), Bergmann Associates (EA), Kennedy Mechanical (mechanical engineer), and Billitier Electric (el
This article first appeared in the August 2012 issue of BD+C.

Students work in the undergraduate chemistry classroom, in the University of Rochester’s Hutchison Hall, a structure originally built in the 1960s.

Constructed in three months at a cost of $1.5 million, the 2,265-sf laboratory is a prototype for future development at the university. According to Joseph Dinnocenzo, professor of chemistry at the University of Rochester, the lab was designed to bring together the three phases of experimental work: design, execution, and analysis.

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR ARCHITECTURE FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 HDR Architecture 60,900,000  
2 Perkins+Will 54,976,710  
3 HOK 39,049,209  
4 Flad Architects 35,280,000  
5 SmithGroupJJR 31,200,000  
6 Payette 17,207,046  
7 Ballinger 10,940,133  
8 EwingCole 10,000,000  
9 S/L/A/M Collaborative, The 7,895,193  
10 NBBJ 7,394,000  
11 PageSoutherlandPage 7,038,000  
12 BSA LifeStructures 6,339,395  
13 Ennead Architects 5,890,000  
14 Gensler 4,100,000  
15 Harley Ellis Devereaux 3,600,000  
16 OZ Architecture 3,006,974  
17 Wight & Company 2,959,100  
18 ZGF Architects 2,781,476  
19 Ware Malcomb 2,264,000  
20 Kirksey Architecture 2,108,182  
21 Reynolds, Smith and Hills 2,100,000  
22 Lord, Aeck & Sargent 1,445,819  
23 Perkins Eastman 1,300,000  
24 SMMA|Symmes Maini & McKee Associates 1,217,481  
25 IBI Group 1,206,499  

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR ENGINEERING FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 Jacobs 692,920,000
2 M+W U.S. 105,132,043
3 Stantec 42,300,000
4 Affiliated Engineers 14,482,000
5 Middough 12,500,000
6 URS Corp. 11,485,000
7 Bard, Rao + Athanas Consulting Engineers 10,000,000
8 R.G. Vanderweil Engineers 8,231,300
9 Merrick & Co. 6,150,000
10 Bergmann Associates 5,300,000
11 RMF Engineering 4,500,000
12 WSP USA 4,200,000
13 Smith Seckman Reid 4,070,000
14 Clark Nexsen 4,046,032
15 STV 3,082,000
16 SSOE Group 3,043,000
17 Thornton Tomasetti 1,792,193
18 ccrd partners 1,250,000
19 RMH Group, Inc., The 1,192,171
20 RDK Engineers 1,092,000
21 Wiss, Janney, Elstner Associates 1,037,000
22 KPFF Consulting Engineers 1,000,000
23 AKF Group 1,000,000
24 Paulus, Sokolowski and Sartor 1,000,000
25 Karpinski Engineering 868,947

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR CONSTRUCTION FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 Whiting-Turner Contracting Company, The 704,586,928
2 Jacobs 692,920,000
3 Turner Corporation, The 270,000,000
4 DPR Construction 260,132,313
5 Manhattan Construction Group 203,632,000
6 JE Dunn Construction 147,553,307
7 Lend Lease 135,276,349
8 Structure Tone 105,970,000
9 Tutor Perini 68,084,000
10 Layton Construction 45,300,000
11 E.W. Howell Co. 43,137,000
12 McCarthy Holdings 41,000,000
13 Weitz Company, The 39,314,126
14 Messer Construction Co. 28,777,706
15 Coakley & Williams Construction 22,023,492
16 Flintco 20,800,000
17 Gilbane Building 17,822,000
18 Choate Construction 15,422,770
19 S. M. Wilson & Co. 12,268,944
20 Linbeck Group 12,000,000
21 URS Corp. 11,485,000
22 CORE Construction 8,242,587
23 McShane Companies, The 8,000,000
24 Yates Companies, Inc., The 4,000,000
25 Kraus-Anderson Construction 3,000,000

Related Stories

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021