University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to slip less than 5% over the next two years. However, the value of starts dropped about 10% in recent months and will not return to the 2007–08 peak for about two years.
Company | Billings ($) | |
Source: 2009 Giants 300 survey. For expanded university design rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Burt Hill | 81,834,000 |
2 | HOK | 75,200,000 |
3 | AECOM Technology Corp. | 63,529,000 |
4 | Cannon Design | 51,084,000 |
5 | Perkins+Will | 48,000,000 |
6 | Gensler | 37,215,000 |
7 | SmithGroup | 36,948,750 |
8 | HDR Architecture | 33,940,000 |
9 | Arup | 33,000,000 |
10 | RMJM | 32,497,392 |
11 | Sasaki Associates | 30,950,000 |
12 | Ellerbe Becket | 28,299,184 |
13 | Dewberry | 28,270,000 |
14 | Jacobs | 27,144,560 |
15 | Affiliated Engineers | 27,132,120 |
16 | EYP Architecture & Engineering | 25,500,000 |
17 | Parsons Brinckerhoff | 25,098,000 |
18 | Stantec | 24,596,000 |
19 | URS Corp. | 21,000,000 |
20 | R.G. Vanderweil Engineers | 20,393,105 |
Company | Value put in place ($) | |
Source: 2009 Giants 300 survey. For expanded university contractor rankings, visit: www.BDCnetwork.com/Giants | ||
1 | Turner | 1,150,600,000 |
2 | Gilbane Building Co. | 703,599,820 |
3 | Whiting-Turner Contracting Co. | 492,258,678 |
4 | Structure Tone | 454,141,500 |
5 | Skanska USA Building | 427,071,221 |
6 | Swinerton Inc. | 299,360,000 |
7 | Webcor Builders | 293,807,692 |
8 | PCL Construction Enterprises | 288,471,629 |
9 | McCarthy Holdings | 277,101,000 |
10 | Flintco Cos., The | 254,428,800 |
11 | JE Dunn Construction Group | 248,391,000 |
12 | Mortenson Construction | 226,008,000 |
13 | Hoffman Construction | 224,000,000 |
14 | Bovis Lend Lease | 212,903,379 |
15 | Clark Group | 210,050,000 |
16 | Austin Industries | 208,199,672 |
17 | Hensel Phelps Construction | 200,220,000 |
18 | C.W. Driver | 177,710,764 |
19 | Hunt Construction Group | 175,000,000 |
20 | DPR Construction | 165,245,490 |
2009 | 2008 | Company | 2008 Billings ($) |
Rank | |||
Source: 2009 Giants 300 survey. For expanded Engineering Firmrankings, visit: www.BDCnetwork.com/Giants | |||
1 | 4 | Syska Hennessy Group | 115,600,000 |
2 | 2 | Fluor Corp. | 114,470,000 |
3 | 3 | KPFF Consulting Engineers | 81,000,000 |
4 | 6 | Affiliated Engineers | 75,367,000 |
5 | 5 | Smith Seckman Reid | 68,260,000 |
6 | 10 | Walter P Moore | 64,572,266 |
7 | 18 | Henderson Engineers | 58,350,590 |
8 | 14 | KJWW Engineering Consultants | 58,265,636 |
9 | 8 | R.G. Vanderweil Engineers | 55,116,500 |
10 | 11 | TLC Engineering for Architecture | 54,685,784 |
11 | — | John A. Martin & Associates | 53,821,300 |
12 | 15 | Clark, Richardson & Biskup Consulting Engineers | 53,688,000 |
13 | 17 | TMAD Taylor & Gaines | 51,030,000 |
14 | 16 | Schirmer Engineering Corp. | 49,483,833 |
15 | 20 | M-E Engineers | 44,700,000 |
16 | 19 | Rolf Jensen & Associates | 44,595,000 |
17 | 23 | Environmental Systems Design | 42,000,000 |
18 | 21 | Weidlinger Associates | 41,000,000 |
19 | 22 | Magnusson Klemencic Associates | 40,000,000 |
20 | 25 | Glumac | 35,500,000 |
21 | 41 | Mazzetti Nash Lipsey Burch | 32,500,000 |
22 | 26 | RDK Engineers | 32,000,000 |
23 | — | Degenkolb Engineers | 31,124,000 |
24 | 33 | KCI Technologies | 28,300,000 |
25 | 12 | X-nth | 27,095,370 |
26 | 27 | Interface Engineering | 26,624,398 |
27 | 9 | Birdsall Services Group | 26,350,000 |
28 | 29 | Coffman Engineers | 26,259,000 |
29 | 28 | Sparling | 26,250,000 |
30 | 30 | M/E Engineering | 25,735,000 |
31 | 44 | Newcomb & Boyd | 25,577,207 |
32 | 32 | H.F. Lenz Co. | 24,000,000 |
33 | 42 | Heapy Engineering | 21,573,000 |
34 | 31 | Henneman Engineering | 21,083,000 |
35 | 37 | GHT Limited | 19,600,000 |
36 | 43 | Rutherford & Chekene | 17,236,000 |
37 | 38 | Joseph R. Loring & Associates | 16,800,000 |
38 | 35 | Lilker Associates Consulting Engineers | 16,000,000 |
39 | 46 | Bridgers & Paxton Consulting Engineers | 15,341,792 |
40 | 36 | Wallace Engineering | 15,070,000 |
41 | — | Dunham Associates | 14,500,000 |
42 | 47 | Peter Basso Associates | 14,300,000 |
43 | 40 | KTA Group | 13,800,000 |
44 | — | Brinjac Engineer | 12,540,000 |
45 | 50 | James Posey Associates | 12,200,000 |
46 | 49 | CB Engineers | 10,410,000 |
47 | 45 | Bala Consulting Engineers | 10,200,000 |
48 | 48 | Wick Fisher White Engineers | 10,000,000 |
49 | 51 | RMH Group, The | 9,848,715 |
50 | — | KLH Engineers | 9,595,932 |
51 | — | Allen & Shariff Corp. | 9,500,000 |
Related Stories
Performing Arts Centers | Jun 30, 2017
L.A.’s John Anson Ford Amphitheater might finally be ready for its close-up
The performing arts venue, nearly a century old, has undergone an extensive refurbishing.
Building Team | Jun 27, 2017
Bruner Foundation announces 2017 Rudy Bruner Award for Urban Excellence gold and silver medalists
The SteelStacks Arts and Cultural Campus in Bethlehem, Pa., receives the gold medal and $50,000.
Libraries | May 31, 2017
A year after its facelift, Boston’s Public Library is relevant again
Visitors are flocking to its brighter, connected halls, which now include retail and digital components.
Cultural Facilities | May 25, 2017
The Shed, a multi-arts center on New York’s west side, moves forward in construction and funding
The facility, designed for maximum programming flexibility, includes a massive movable shell.
Cultural Facilities | May 4, 2017
Obama Foundation reveals first look at the Obama Presidential Center
The design comprises three buildings set in the public space of Jackson Park on Chicago’s South Side.
Performing Arts Centers | Mar 6, 2017
An oval defines the Frank Gehry-designed Pierre Boulez Saal concert hall
The hall hosted its debut concert on Saturday, March 4 with a performance by the Boulez Ensemble.
Cultural Facilities | Mar 2, 2017
The Hanoi Lotus Centre will bloom from the middle of a lake
The building will act as a symbol of growth and prosperity for the city of Hanoi.
Cultural Facilities | Jan 30, 2017
Former windmill factory proposed as new ‘vibrant culture house’
The transformed building would provide space for street sports, street culture, and street art.
Cultural Facilities | Dec 14, 2016
Institutions aggressively targeting private donors to fund construction projects
Capital campaigns abound, even though government financing still plays a vital role.
Cultural Facilities | Oct 27, 2016
Zaha Hadid Architects’ Urban Heritage Administration Centre takes its design from the surrounding desert
The futuristic curves that have become a staple for ZHA-designed buildings are also on full display.