flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gilbane awarded $88M Contract for Ohio elementary school construction

Gilbane awarded $88M Contract for Ohio elementary school construction

The new award, which comprises the construction of five new elementary schools and demolition of 11 older facilities, is the latest K-12 building program managed by Gilbane for the Ohio School Facilities Commission since 1998.


By By BD+C Staff | January 3, 2012

Gilbane Building Company announced its selection by the Ohio School Facilities Commission (OSFC) and Elyria City Schools to provide construction management services for an $88 million school construction initiative. The program, which will be designed by Architectural Vision Group, includes the construction of five new elementary schools to house grades pre-kindergarten through fifth grade and the abatement and demolition of 11 existing schools. The new schools will provide modern facilities for more than 3,200 students in the district. In choosing Gilbane, OSFC cited Gilbane’s strong senior leadership and its outstanding record of customer satisfaction on past Ohio school construction efforts.

“We are thrilled to have been selected by OSFC to lead this exciting project,” says Robert Sewell, Gilbane’s Senior Project Executive for the Elyria City Schools effort. “It gives us great pride to build on the successful track record we’ve established with this valued client and the Ohio educators, students, and families that our K-12 construction efforts support. The Elyria City Schools program will deliver tremendous new learning facilities for the city’s children together with significant operational savings thanks to the consolidation of the older facilities. We look forward to working with OSFC and Elyria City to ensuring the successful delivery of the highest quality schools on time and on budget.”

Gilbane has worked with OSFC to build and improve Ohio’s K-12 schools on a range of projects since 1998. In addition to its work with OSFC, Gilbane has provided construction management services for many of Ohio’s most prominent organizations including The Cleveland Clinic, University Hospitals, KeyBank, Huntington National Bank, Progressive Insurance, Kent State University, the Cleveland Metropolitan School District, Ohio State University, Battelle, Nationwide Children’s Hospital, OhioHealth, and Franklin County. BD+C

Related Stories

Multifamily Housing | Apr 22, 2015

Condo developers covet churches for conversions

Former churches, many of which are sitting on prime urban real estate, are being converted into libraries, restaurants, and with greater frequency condominiums.

High-rise Construction | Apr 22, 2015

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.

Architects | Apr 22, 2015

Architecture Billings Index accelerates in March

For the second consecutive month, the Architecture Billings Index indicated a modest increase in design activity in March.

Green | Apr 22, 2015

AIA Committee on the Environment recognizes Top 10 Green Projects

Seattle's Bullitt Center and the University Center at The New School are among AIA's top 10 green buildings for 2015.

Museums | Apr 22, 2015

Check out Ralph Johnson's stunning nature-inspired Shanghai museum

The newly opened Shanghai Natural History Museum, designed by Perkins+Will’s Global Design Director Ralph Johnson, mimics the shape of a nautilus shell, and features natural elements throughout. 

Green | Apr 22, 2015

GSA's Federal Center South Building honored with AIA Top Ten Plus Award for 'verified' sustainable performance

The annual award recognizes green building projects that have quantifiable metrics demonstrating the performance and positive impact of the sustainable design.

Architects | Apr 21, 2015

Megatrends shaping commercial building design

Gensler’s 2015 Design Forecast focuses on how changes in demographics, workplace preferences, and technology are affecting how and why structures get built.

Office Buildings | Apr 21, 2015

Stop the endless debate over open vs. closed work environments

Rather than be confused by the constant stream of opinions, leadership teams contemplating workplace investments should start with powerful employee engagement strategies that drive results.

BIM and Information Technology | Apr 21, 2015

Software tools shouldn't dictate the AEC process

With over 200 solutions on the market, construction software is one of the most complex and fragmented markets, writes Gensler's Mark Thole.

Cultural Facilities | Apr 20, 2015

Jean Nouvel loses court battle against Philharmonie de Paris over alleged design ‘sabotage’

Nouvel boycotted the January opening of the facility and asked for his name to be removed from all references to the work. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021