flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gilbane awarded $88M Contract for Ohio elementary school construction

Gilbane awarded $88M Contract for Ohio elementary school construction

The new award, which comprises the construction of five new elementary schools and demolition of 11 older facilities, is the latest K-12 building program managed by Gilbane for the Ohio School Facilities Commission since 1998.


By By BD+C Staff | January 3, 2012

Gilbane Building Company announced its selection by the Ohio School Facilities Commission (OSFC) and Elyria City Schools to provide construction management services for an $88 million school construction initiative. The program, which will be designed by Architectural Vision Group, includes the construction of five new elementary schools to house grades pre-kindergarten through fifth grade and the abatement and demolition of 11 existing schools. The new schools will provide modern facilities for more than 3,200 students in the district. In choosing Gilbane, OSFC cited Gilbane’s strong senior leadership and its outstanding record of customer satisfaction on past Ohio school construction efforts.

“We are thrilled to have been selected by OSFC to lead this exciting project,” says Robert Sewell, Gilbane’s Senior Project Executive for the Elyria City Schools effort. “It gives us great pride to build on the successful track record we’ve established with this valued client and the Ohio educators, students, and families that our K-12 construction efforts support. The Elyria City Schools program will deliver tremendous new learning facilities for the city’s children together with significant operational savings thanks to the consolidation of the older facilities. We look forward to working with OSFC and Elyria City to ensuring the successful delivery of the highest quality schools on time and on budget.”

Gilbane has worked with OSFC to build and improve Ohio’s K-12 schools on a range of projects since 1998. In addition to its work with OSFC, Gilbane has provided construction management services for many of Ohio’s most prominent organizations including The Cleveland Clinic, University Hospitals, KeyBank, Huntington National Bank, Progressive Insurance, Kent State University, the Cleveland Metropolitan School District, Ohio State University, Battelle, Nationwide Children’s Hospital, OhioHealth, and Franklin County. BD+C

Related Stories

| Aug 14, 2014

How workplace design can empower employees, businesses

Focusing on recent work at Follett and Zurich, CannonDesign’ Meg Osman reveals the power of research, strategy, change management, and measurement to transform businesses for the better.

| Aug 13, 2014

UIA commits to phasing out CO2 emissions in built environment

The International Union of Architects, representing approximately 2.3 million architects worldwide, has unanimously adopted the 2050 Imperative committing to environmental and social sustainability. 

| Aug 13, 2014

ADD Inc. to merge with Stantec

The deal, which helps Stantec strengthen its capabilities in the buildings business on the East Coast, is expected to close in September.

| Aug 13, 2014

Campus UX: Why universities should be creating 'branded environments' on campus

When most colleges and universities consider their brands, they rarely venture beyond the design and implementation of a logo, writes Gensler Design Director Brian Brindisi.

| Aug 12, 2014

Vietnam's 'dragonfly in the sky' will be covered in trees, vegetation

Designed by Vietnamese design firm Vo Trong Nghia Architects, the building will be made up of stacked concrete blocks placed slightly askew to create a soft, organic form that the architects say is reminiscent of a dragonfly in the sky.

| Aug 12, 2014

First look: Calatrava's futuristic Main Building opens at Florida Polytechnic University

The $60 million structure is wrapped in a bright-white, aluminum pergola for dramatic effect and solar shading.

| Aug 12, 2014

Shading prototype could allow new levels of environmental control for skyscraper occupants

Developed by architects at NBBJ, Sunbreak uses a unique three-hinged shade that morphs from an opaque shutter to an abstract set of vertical blinds to an awning, depending on what is needed.

| Aug 12, 2014

Design firms invited to submit qualifications for St. Petersburg, Fla., waterfront project

The city of St. Petersburg, Fla., invites firms to submit their ideas for a new and improved pier for Florida's fifth largest city.

| Aug 11, 2014

Air Terminal Sector Giants: Morphing TSA procedures shape terminal design [2014 Giants 300 Report]

The recent evolution of airport terminals has been prompted largely by different patterns of passenger behavior in a post-9/11 world, according to BD+C's 2014 Giants 300 Report.

| Aug 11, 2014

The Endless City: Skyscraper concept connects all floors with dual ramps

Rather than superimposing one floor on top of another, London-based SURE Architecture proposes two endless ramps, rising gradually with a low gradient from the ground floor to the sky.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021