flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gilbane names two new executive vice presidents

Gilbane names two new executive vice presidents

Dennis Cornick and Thomas Laird join Gilbane's executive team, expanding the company's leadership to drive business goals.


By Posted by Tim Gregorski, Senior Editor | June 14, 2012

Gilbane Building Company announced the promotion of two new executive vice presidents to its leadership team. Dennis Cornick and Thomas Laird have joined Gilbane's executive ranks to further the company's efforts toward continued growth both domestically and internationally.

A 22-year veteran of Gilbane, Dennis Cornick has been named executive vice president and national director of sales and marketing. In this position, he will help drive the growth of the organization and set strategies to complement Gilbane's operational excellence efforts.

Cornick has a long track record of success at both the regional and national levels. He has served as a senior vice president and national
director of sales and marketing for the last several years. As an EVP, Cornick will continue to champion a robust one-company approach to sales and national accounts.

Thomas Laird has also been promoted to executive vice president. Laird will continue to be responsible for Gilbane's Central region, which has
enjoyed significant growth under his leadership, and will now also assume operational responsibility of the Midwest and Delaware Valley regions as well as Gilbane's CAT Response consulting service.

Laird is a 27-year veteran of Gilbane who joined the company as a management trainee in 1986 and progressed through a number of
construction operations and leadership assignments, including regional manager of business development in the Mid-Atlantic Region, district manager in the Cleveland office and vice president, regional manager of Gilbane's Central region and senior vice president. +

Related Stories

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Dec 9, 2012

14 great solutions

Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

| Dec 7, 2012

Structural glazing sealant protects solar-rooftop stadium in Taiwan

Designers of the Kaohsiung World Games Main Stadium in Gaoxiong, Taiwan, powered by almost 9,000 rooftop solar panels, required an effective panel fixing design offering optimum energy transfer rate, plus thermal and weathertight performance. Dow Corning specialists recommended a four-sided structural sealant solution featuring Dow Corning 983 Structural Glazing Sealant.

| Dec 6, 2012

Ziegler Cooper names Soto as Director of Design, Broadens Design Capabilities

Soto will oversee design efforts, bringing a high level of quality and problem solving capabilities through active engagement with clients and studios firm wide.

| Dec 5, 2012

Gilbane publishes Winter 2012 construction economic report

Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.

| Dec 5, 2012

Gehry-designed New York City tower receives Emporis Skyscraper Award

8 Spruce Street is now the third New York tower to win the Emporis Skyscraper Award.

| Dec 4, 2012

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021