Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.


By Posted by Tim Gregorski, Senior Editor | December 5, 2012

Gilbane Building Company today announces the publication of the Winter 2012 edition of Construction Economics -- Market Conditions in Construction. Based on an array of economic data, construction starts, and material cost trends, this free report indicates an increase in construction spending over last year but cautions of an expected downturn again in early 2013.

According to the report, margins are up a slim 1% to 2% year over year for 2012. Once 2013 growth in nonresidential work picks up and both residential and nonresidential are active, the industry may begin to see some labor shortages and productivity losses, which will push up escalation. Also, as it did in 2012, even moderate growth in activity will allow contractors to pass along more material costs and increase margins.

Potential impact of recent events:

  • According to the Associated General Contractors (AGC), Hurricane Sandy may not add any economic impact to the construction industry. For the most part, any funds directed to reconstruction will be diverted from some other potential or previously planned construction project and will be spread over a long time span.
  • Bond issues considered in the recent elections amount to just over half ($30+ billion) of what was approved in 2008 elections ($60+ billion), signaling a reduction in publicly funded work.
  • At the recent McGraw Hill Outlook conference, none of the economists expect the fiscal cliff to happen. However, sequestration or the compromises agreed upon will likely reduce funds available for federal and public projects.

Among the topics covered in this comprehensive report are:

  • Construction Starts, Spending, & Costs
  • Material Price Movement
  • Trends and Costs for Structural Steel, Recycling Steel, & Copper
  • Architectural Billings Index
  • Current Inflation Forecast
  • ENR Index -- BCI History

This free report is available for download at http://info.gilbaneco.com/construction-economics. +

 

Related Stories

Coronavirus | Jun 12, 2020

BD+C launches 'The Weekly,' a streaming program for the design and construction industry

The first episode, now available on demand, features experts from Robins & Morton, Gensler, and FMI on the current state of the AEC market.

Architects | May 28, 2020

Ghafari joins forces with Eview 360

Global architecture + engineering firm announces investment in experiential design agency.

Coronavirus | May 26, 2020

9 tips for mastering virtual public meetings during the COVID-19 pandemic

Mike Aziz, AIA, presents 9 tips for mastering virtual public meetings during the COVID-19 pandemic.

Architects | May 26, 2020

AIA honors exceptional designs with its COTE Top Ten Awards

Projects integrate high design with advanced performance in ten key areas.

Coronavirus | May 22, 2020

COVID-19: Healthcare designers look to the future of medical facilities in light of coronavirus pandemic

The American College of Healthcare Architects (ACHA) has released the key findings of a survey of its members revealing their insights on the future of healthcare architecture and the role of design in the context of the COVID-19 healthcare crisis.

Coronavirus | May 18, 2020

Infection control in office buildings: Preparing for re-occupancy amid the coronavirus

Making workplaces safer will require behavioral resolve nudged by design.

Data Centers | May 8, 2020

Data centers as a service: The next big opportunity for design teams

As data centers compete to process more data with lower latency, the AEC industry is ideally positioned to develop design standards that ensure long-term flexibility. 

Coronavirus | Apr 30, 2020

Gilbane shares supply-chain status of products affected by coronavirus

Imported products seem more susceptible to delays

Architects | Apr 23, 2020

Take a virtual tour of Frank Lloyd Wright's Robie House

Explore the building with Frank Lloyd Wright Trust curator David Bagnall.  

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021