The joint venture of Gilbane Building Company and Turner Construction Company, in association with 34 Group, has been selected to provide construction management of the planned new NFL stadium for the Buffalo Bills in Orchard Park, N.Y. The project team also includes the project management firm, Legends Project Development, and Populous as the designer.
Gilbane and Turner have a 25-year history of collaborating on construction projects, including the new construction or renovation of 16 NFL stadiums, and some 5.5 million sf of construction put in place.
The project scope, according to the Buffalo Bills, includes a new 1.35 million-sf open-air stadium, a 18,750-sf ancillary building, demolition of the current stadium, and related site development. The stadium’s capacity will be approximately 60,000 seats with an expandable capacity to hold special events. It is set to open fall of 2026.
More from the Bills: Premium areas will include suites, ledge seats, clubs, and other premium seating products. The stadium will include state-of-the-art video and scoreboards, sound system, administrative and event staff offices and lockers, broadcast facilities, team store, locker rooms, food service kitchens and concessions, signage, sports lighting, maintenance, and storage areas, plaza, parking, and site landscaping.
“We continue to partner with a first-class team of experts and professionals to bring our stadium to life," said Bills Executive Vice President/Chief Operation Officer Ron Raccuia. “Gilbane | Turner has a tremendous wealth of experience in stadium construction and we look forward to partnering with them.”
Buffalo Bills stadium draws inspiration from historical architecture of Buffalo
Design details from Populous: The exterior design highlights the team’s desire for a visual identity that reflects some of the historical architecture of Buffalo, while also delivering a future-forward appearance.
“The stadium will create a new place to foster the iconic culture of the Bills fan base, while creating an exciting vision for the future of the franchise and the community,” said Populous senior principal Scott Radecic. “As we continue to work with the Bills, we look forward to creating an industry-changing stadium that reflects Buffalo’s strong community and history.”
“Our approach to the design takes its cues from historic architecture in Buffalo, such as ‘The Rockpile,’ ‘The Aud,’ and Kleinhans Music Hall, and merges their projection of strength with modern materials and a building form that is set to create an intimate and intimidating football-first environment,” said Populous senior principal Jonathan Mallie. “We are thrilled with the progression of the design for the new stadium and all that lies ahead.”
SEE ALSO: Chicago Bears unveil preliminary master plan for suburban stadium district
The initial design, which is subject to updates, features a stacked seating interior bowl to enhance crowd noise, as well as dynamic fan areas that will include local food and beverage offerings and foster fan culture.
The project team is inviting interested subcontractors, vendors, suppliers, and professional services firms to bid on the project here.
Related Stories
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 24, 2012
Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence
Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Jan 31, 2012
Fusion Facilities: 8 reasons to consolidate multiple functions under one roof
‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series on the design and construction of university facilities.
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.
| Nov 9, 2011
Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers
Program leads the industry in recovering and recycling roofing membrane into new roofing products.
| Nov 1, 2011
Sasaki expands national sports design studio
Sasaki has also added Stephen Sefton to the sports design studio as senior associate.
| Oct 20, 2011
UNT receives nation’s first LEED Platinum designation for collegiate stadium
Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.