flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Glorya Kaufman Performing Arts Center begins construction

Performing Arts Centers

The Glorya Kaufman Performing Arts Center begins construction

AUX Architecture designed the building.


By David Malone, Associate Editor | January 31, 2019
Glorya Kaufman Performing Arts Center at dusk

Courtesy AUX Architecture.

Construction is now underway on the Glorya Kaufman Performing Arts Center located on the Vista Del Mar Child and Family Services campus. The building combines a remodel of and an addition to an existing temple building that was built in 1965 as the campus Synagogue.

The AUX Architecture-designed building will be a 300-seat performing arts center that will house the Glorya Kaufman Therapeutic Dance Program. The building will also include a rehearsal studio, lobby, box office, dressing rooms, theatrical support spaces, and storage.

 

Glorya Kaufman Performing Arts CenterCourtesy AUX Architecture.

See Also: This is the first performance complex in Asia devoted to pop music

 

The theater is envisioned as the catalyst for the school’s long-term goals of advancing its arts programs and to help shape the future of the overall campus. The theater will be used for school events, such as dance, drama, theatre and music education, school assemblies, and temple functions; professional performance groups; and artist + student workshops.

The Center is slated for completion in fall 2019.

 

The 300 seat theater in the Glorya Kaufman Performing Arts CenterCourtesy AUX Architecture.

Related Stories

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 19, 2012

KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed

First of eight buildings highlights unique amenities.

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Sep 9, 2011

Kauffman Center for the Performing Arts in Kansas City opens this month

Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.

| May 18, 2011

Carnegie Hall vaults into the 21st century with a $200 million renovation

Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.

| Apr 12, 2011

Long-awaited San Francisco center is music to jazz organization’s ears

After 28 years, SFJAZZ is getting its first permanent home. The San Francisco-based nonprofit, which is dedicated to advancing the art of jazz through concerts and educational programs, contracted local design firm Mark Cavagnero Associates and general contractor Hathaway Dinwiddie to create a modern performance center in the city’s Hayes Valley neighborhood

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021