flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Glorya Kaufman Performing Arts Center begins construction

Performing Arts Centers

The Glorya Kaufman Performing Arts Center begins construction

AUX Architecture designed the building.


By David Malone, Associate Editor | January 31, 2019
Glorya Kaufman Performing Arts Center at dusk

Courtesy AUX Architecture.

Construction is now underway on the Glorya Kaufman Performing Arts Center located on the Vista Del Mar Child and Family Services campus. The building combines a remodel of and an addition to an existing temple building that was built in 1965 as the campus Synagogue.

The AUX Architecture-designed building will be a 300-seat performing arts center that will house the Glorya Kaufman Therapeutic Dance Program. The building will also include a rehearsal studio, lobby, box office, dressing rooms, theatrical support spaces, and storage.

 

Glorya Kaufman Performing Arts CenterCourtesy AUX Architecture.

See Also: This is the first performance complex in Asia devoted to pop music

 

The theater is envisioned as the catalyst for the school’s long-term goals of advancing its arts programs and to help shape the future of the overall campus. The theater will be used for school events, such as dance, drama, theatre and music education, school assemblies, and temple functions; professional performance groups; and artist + student workshops.

The Center is slated for completion in fall 2019.

 

The 300 seat theater in the Glorya Kaufman Performing Arts CenterCourtesy AUX Architecture.

Related Stories

Performing Arts Centers | Apr 25, 2017

The ‘Chrysalis’ brings 5,000 sf of outdoor performance space to Maryland’s Merriweather Park

The stage is covered with a curving steel and aluminum-shingled shell.

Performing Arts Centers | Mar 6, 2017

An oval defines the Frank Gehry-designed Pierre Boulez Saal concert hall

The hall hosted its debut concert on Saturday, March 4 with a performance by the Boulez Ensemble.

Performing Arts Centers | Jan 17, 2017

This reimagined Globe Theatre is created primarily with shipping containers

The Container Globe would be used for theater performances, live music, and as a sculpture garden.

Performing Arts Centers | Aug 31, 2016

Sydney Opera House scheduled for $200 million upgrade

Acoustical improvements will be made alongside upgrades in accessibility, efficiency, and flexibility.

Performing Arts Centers | Jun 16, 2016

Synagogues in Omaha and New York get new lives after intense reconstruction

The Omaha Conservatory of Music gets a new home in a temple. A fire leads to an ambitious rebuild for a NYC synagogue.

Performing Arts Centers | May 4, 2016

Diamond Schmitt unveils designs for Buddy Holly Hall performing arts center

The spacious and versatile complex can hold operas, plays, rock concerts, and conferences.  

Cultural Facilities | May 4, 2016

World’s largest cultural center planned for Dubai

The Opera District will have a 2,000-seat theater and three residential complexes.  

Performing Arts Centers | Apr 22, 2016

Construction begins on RUR Architecture’s Taipei Pop Music Center’s South Site

The designers believe the center, which will have performance areas, production spaces, and a hall of fame, will be the Hollywood of Asian Pop music.

Performing Arts Centers | Apr 1, 2016

Adrian Smith + Gordon Gill Architecture’s The Yard at Chicago Shakespeare to begin construction this spring at Navy Pier

Among the unique design features is a movable set of structural audience “towers” that allows for directors and designers to create a space that works best for their specific performances.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021