A three-level, robotic parking garage will be built underneath an upcoming addition to the ZGF Architects-designed Seattle Cancer Care Alliance (SCCA) clinic in Seattle’s South Lake Union neighborhood. GLY has partnered with WÖHR and subcontractor Harding Steel to build the WÖHR Multiparker 730 system.
The garage, which will solve space challenges and improve the experience for cancer patients and their families, will be the first of its kind for any medical center in the Puget Sound Region and the first of its size and scale on the West Coast. It will be built under a long, narrow 240,000-sf, five-story complex also being constructed by GLY.
See Also: Power moves: The Shed
Patients will be able to drop their vehicle off at a centralized valet who then will take the cars to one of the garage’s robotic lifts and platforms that shift cars vertically and horizontally until they reach a designated spot. The system will be able to park cars closer together than traditional parking spaces, with about 160-180 spots in total. It will also reduce the time and hassle of patients getting in and out of small, ramp-filled garages.
The garage is being designed to be flexible for future use, as it can be disassembled and reshaped for different uses to accommodate needs for future services.
Related Stories
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 10, 2014
Ranked: Top transit facility sector AEC firms [2014 Giants 300 Report]
Leo A Daly, URS, and Skanska head BD+C's rankings of the largest transit facility sector design and construction firms, based on the 2014 Giants 300 Report.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Sep 1, 2014
Ranked: Top federal government sector AEC firms [2014 Giants 300 Report]
Clark Group, Fluor, and HOK top BD+C's rankings of the nation's largest federal government design and construction firms, as reported in the 2014 Giants 300 Report.
| Aug 27, 2014
If you value your life, don't walk in Florida
A report from Smart Growth America on pedestrian fatalities shows that cities in Florida and other parts of the Sunbelt are more deadly than others.
| Aug 26, 2014
Ranked: Top industrial sector AEC firms [2014 Giants 300 Report]
Stantec, Jacobs, and Turner top BD+C's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2014 Giants 300 Report.
| Aug 25, 2014
Photographer creates time-lapse video of 1 WTC using 30,000 photos
Choosing from 30,000 photos he took from the day construction began in 2006 to the day when construction was finished in 2012, Brooklyn-based photographer Benjamin Rosamund compressed 1,100 photos to create the two-minute video.
| Aug 20, 2014
Seattle's King Street Station thoughtfully restored [2014 Reconstruction Awards]
After years of neglect and botched renovations, King Street Station sparkles once again.