Located in the heart of the third-largest suburb of Chicago—and one of its most prominent cities—North Central College has been an anchor and dedicated community member in Naperville for more than 155 years. The 3,000-student, 65-acre campus is surrounded by historic residential neighborhoods, just blocks from the quaint downtown.
The school’s newest addition, the 124,000-sf Wentz Science Center, sits on the edge of campus and was designed to engage the surrounding neighborhoods, as well as students and faculty. Public areas and flexible spaces—including a sandwich shop and events space—were incorporated into the facility to draw in the general public.
To address concerns over the size and scale of the science building, the project team worked closely with community leaders to optimize the design and programming for minimal disruption to the neighborhood. On the building’s east façade, which faces the residential neighborhood, the windows were downsized and the overall architectural expression was restrained to reflect the scale of the historic homes across the street. To minimize noise and movement, the building’s quiet functions—namely academic offices—were located along this perimeter.
By contrast, the west façade, which faces the center of campus, is designed to showcase the action within the facility. Public areas, labs, classrooms, and other lively spaces were placed along this perimeter. Large windows and three-story glass curtain wall elements maximize transparency, daylighting, and views of the campus. Electrochromic glass was installed along this façade to control solar heat gain, glare, and daylighting. The construction team built full-scale mockups to determine the best approach and to work through design and installation issues related to the dynamic glazing.
After construction commenced, the client requested that the project schedule be compressed by six weeks so that the building could be occupied by the spring semester. To meet the condensed schedule, the team employed a variety of Lean tactics, including pull-planning and streamlined overtime budgets. Rather than tracking overtime by trade, each company condensed all overtime in one collective budget. Each week during pull-planning, the team assessed what critical path trades made the most sense to work weekends based on how that work would advance the overall schedule and where the team could deliver the maximum value.
As a result, the project opened ahead of the revised schedule, and under budget.
Students gather in front of the Golden Ratio Wall art installation, which symbolizes the building’s goal: to connect the arts and history with math and science. Steve Woltmann Photography.
Building Team — Submitting firm, general contractor Pepper Construction Owner North Central College Architect, structural engineer Holabird & Root Civil engineer Cemcon MEP engineer Ketchmark & Associates Owner’s rep. CBRE
General Information — Size 139,000 sf Construction cost $60 million Construction time July 2015 to March 2017 Delivery method CM at risk
RETURN TO THE 2018 BUILDING TEAM AWARDS LANDING PAGE
Related Stories
Building Team Awards | Nov 2, 2020
Fans come first at Allianz Field
The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 24, 2020
Emory University Student Center wins the top award in 2020 Building Team Awards
Emory University Student Center wins the top award in 2020 Building Team Awards
Building Team Awards | Oct 22, 2020
Look up to the skies
The Mori Hosseini Student Union at Embry-Riddle Aeronautical University takes home a Silver Award in the 2020 Building Team Awards.
Building Team Awards | Oct 22, 2020
Judging a book by its cover
The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 21, 2020
Big Room equals big results
Tucson’s Banner University Medical Center is honored with a Gold Award in the 2020 Building Team Awards.
Building Team Awards | Oct 21, 2020
New York’s STEM epicenter and career gateway
The CUNY New York City College of Technology Academic Building wins a Gold Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Oct 20, 2020
Seamless speed to market drives Texas hospital’s growth
Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.
Building Team Awards | Oct 20, 2020
Winning with teamwork
The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.
Coronavirus | Oct 8, 2020
The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability
The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.