flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Google to convert an Alabama coal-burning plant to a data center running on clean energy

Industrial Facilities

Google to convert an Alabama coal-burning plant to a data center running on clean energy

This would be the tech giant’s seventh data center in the U.S.


By John Caulfield, Senior Editor | June 26, 2015
Google to convert an Alabama coal-burning plant to a data center running on clean energy

This October, Tennessee Valley Authority will close its outdated Widows Creek coal plant in Stevenson, Ala., which had been providing energy to the region since the 1960s. Photo: TVA Web Team via Wikimedia Commons

The coal-producing industry has taken its lumps of late, a victim of natural gas fracking and restrictions on air pollution. This October, Tennessee Valley Authority (TVA) will finally close its outdated Widows Creek coal plant in Stevenson, Ala., which had been providing energy to the region since the 1960s, rather than knock heads with the EPA over tighter financial and environmental regulations.

That plant, located on 350 acres about 60 miles northeast of Huntsville, will be retrofitted into a data center that runs on renewable energy. Google has agreed to build this $600 million project, which would be its 14th data center globally, but the first it has committed to in eight years, according to the San Antonio Express-News.

Google’s data centers in Iowa and Oklahoma run on wind power, and the Alabama facility will operate solely on renewable energy, possibly a combination of wind and solar.

The company states on its website that it has recently expanded its data centers in the states of Georgia and Iowa, as well as in Singapore and Belgium. Construction on the Alabama plant is scheduled to begin early next year and to bring between 75 and 100 jobs to Jackson County.

Google’s data centers in Iowa and Oklahoma run on wind power, and the Alabama facility will operate solely on renewable energy, possibly a combination of wind and solar, the company states. The data center will be hooked up to TVA’s electrical transmission lines, and Google will work with the Authority to run renewable energy through the latter’s electrical grid.

Alabama Gov. Robert Bentley called this project “the start of a long-lasting, productive relationship with Google.” He credited the TVA’s chairman Joe Ritch for securing the project. Google will benefit from two state tax-abatement packages that stem from the passage, three years ago, of the Alabama Data Processing Center Incentive Enhancement Act, according to AL.com.

Gary Demasi, Google’s director of Global Infrastructure, said in a prepared statement that Google sees “a lot of potential in redeveloping large industrial sites like former coal plants, and we’re excited to bring a data center to Alabama.” Urs Hölzle, Google’s SVP for technical infrastructure, told the New York Times that the company would be evaluating “plausible projects” over the next 12 months.

The data center is expected to incorporate Google’s latest technology efficiencies, which allow it to get 3.5 times the computing power out of the same amount of energy, compared to five years ago.

Related Stories

Industrial Facilities | Oct 25, 2018

Pilot training center completes in Arlington, Texas

Merriman Anderson/Architects was the architect for the project.

Building Automation | Jul 13, 2018

Katerra has plans for a new advanced manufacturing factory in California

The building components facility will be located near rail, shipping ports, and freeways.

Industrial Facilities | Jul 11, 2018

AEC firms tap into the boom in logistics center construction

A Ryan Companies project in southern California is being built to meet its city’s rigorous green standards.

Industrial Facilities | Jun 27, 2018

Hawaii announces completion of $375 million wastewater project

The new sewer tunnel and pump station help enhance Oahu’s utility infrastructure.

Industrial Facilities | Jun 15, 2018

Faraday Future selects GC for its 1 million-sf EV factory

Onsite construction has commenced in an effort to deliver the first FF91 by the year's end.

Market Data | Jun 12, 2018

Yardi Matrix report details industrial sector's strength

E-commerce and biopharmaceutical companies seeking space stoke record performances across key indicators.

Industrial Facilities | Apr 2, 2018

90,000-sf industrial facility will add needed manufacturing space in West Michigan

Vision Real Estate Investment recently broke ground on the building.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021