It took 11 years and creative financing through a public-private partnership to resurrect UC Berkeley’s Bowles Hall, the nation’s first residential college. Built in 1928 and listed on the National Register of Historic Places, the Gothic-style building became too expensive to maintain and fell into disrepair over the years.
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition. The Reconstruction Awards judges noted the project team’s meticulous work in revitalizing the historic structure, including the manual removal and reinstallation of 20,000 historic clay roof tiles (most of them mortared directly onto the roof); the construction of concrete walls, concrete mat foundations, and a buttress to strengthen the building against earthquakes; and the reconfiguration of the layout of the dorms to accommodate modern living needs, with Wi-Fi, central heating, and en suite baths. The team also cleverly converted underutilized attic space into the dean’s apartment.
Project Summary
Honorable Mention
Building Team: Clark Construction Group (submitting firm, GC) Bowles Hall Foundation (owner) EdR (developer) Pyatok (architect) Maffei Structural Engineering (SE) ACCO Engineered Systems (ME) Royal Electric Co. (EE) Pan-Pacific (PE).
Details: 61,200 sf. Total cost: $27.1 million. Construction time: June 2015 to August 2016. Delivery method: CM at risk.
SEE ALL OF THE 2017 RECONSTRUCTION AWARD WINNERS HERE
Related Stories
Reconstruction Awards | Nov 26, 2019
Sweetest sounds: Metropolitan Opera House
An early 20th-century opera house now hosts concerts from Disney Acapella to Weezer.
Reconstruction Awards | Nov 25, 2019
The University of Chicago Harris School at the Keller Center
Project team goes all out for LEED Platinum and the Living Building Challenge.
Reconstruction Awards | Nov 22, 2019
Let there be light: Union Station Great Hall
What’s the cure for a leaky skylight? Another skylight built above it, of course.
Reconstruction Awards | Nov 21, 2019
Temporary quarters: Senate of Canada Building
Canada’s Senate gets an interim home in what was once the capital’s main train station.
Reconstruction Awards | Nov 19, 2019
Springfield Technical Community College: Goodbye to 'the shuffle'
College unites student services under one roof.
Reconstruction Awards | Nov 18, 2019
The Paint Factory: Not just a new coat of paint
An enlightened A/E firm is spurring redevelopment in an old industrial section of Little Rock.
Reconstruction Awards | Nov 15, 2019
Back on track: Union Terminal renovation and restoration
Painstaking care went into restoring Cincinnati’s train terminal/museum complex.
Reconstruction Awards | Nov 14, 2019
Museum at the Gateway Arch: Subterranean sensation
The project team used its creativity to overcome floods and other obstacles to construction.
Reconstruction Awards | Nov 13, 2019
Zachry Engineering Education Complex: Rethinking engineering education
Texas A&M’s engineering school builds for future growth.
Reconstruction Awards | Nov 12, 2019
Linode Headquarters: High-tech + historic
New headquarters mixes old and new to help this fast-growth company attract top talent.