flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gray lady no more: A facelift erases a landmark’s wrinkles, but not her heritage

Reconstruction Awards

Gray lady no more: A facelift erases a landmark’s wrinkles, but not her heritage

The Building Team restored the granite and terra cotta façade and reclaimed more than 500 double-hung windows.


By John Caulfield, Senior Editor | November 17, 2017
The Grand Staircase of The Gray

The Grand Staircase of The Gray, a new Kimpton hotel. The original building was designed by William Le Baron Jenney, known as the father of the skyscraper. Photo: Laure Joliet

By 2006, the New York Life Insurance Building, designed in 1893 by the father of the skyscraper, William Le Baron Jenney, had receded into obsolescence. Its owner, Hamilton Partners, was planning to demolish the 14-story landmark in Chicago’s Loop to make way for a 51-story hotel/office tower next door.

The building, once the Midwest headquarters of New York Life Insurance Company, found a savior in Kimpton Hotels & Restaurants. Kimpton, part of the Intercontinental Hotels Group, bought it from Hamilton in 2013, and worked for the next three years with its project team to execute a robust reconstruction program that preserved the integrity of Jenney’s design while creating a new use for the structure.

The Building Team restored the granite and terra cotta façade and reclaimed more than 500 double-hung windows. It moved the building’s main entrance to West Monroe Street, with a new bronze-clad canopy. The original entrance, on LaSalle Street, now serves as the portal to the Georgia Gray marble double staircase leading to Volume 39, the hotel’s lobby lounge and bar.

The hotel, now called The Gray, has 293 rooms and suites, a fitness center, 12,000 sf of meeting space, and a top-floor ballroom. One of the more stunning additions is Boleo, a South American-style bar that incorporates a 1,200-sf operable skylight.

Due to the lack of drawing documentation, the team had to engage in discovery and investigation over the course of the entire project. The building’s archaic floor framing made it difficult to create new openings for infrastructure and reconfigurations.

The building had no loading dock or space for an exterior hoist, so deliveries had to be made during off hours. An interior hoist had to be installed to move materials. Hazardous materials had to be remediated before interior demolition could begin.

As the awards jury noted, the Building Team overcame all these difficulties and, in keeping with Kimpton’s EarthCare program, executed sustainable and energy-efficient strategies throughout.

 

Project Summary

 

Gold Award Winner

Building Team: Gensler (submitting firm, architect, AOR) KHP Capital Partners (owner/developer) Stillwater Consulting (owner’s rep) Kimpton Hotels & Restaurants (operator) Beleco Design (hotel interiors) Parts and Labor Design (restaurant/lounge interior design) Forefront Structural Engineers (SE) AMS Mechanical Systems (mechanical/plumbing engineer) JMS Electric (EE) James McHugh Construction (GC).

Details: 239,000 sf. Construction cost: ConfidentIal. Construction time: October 2014 to August 2016. Delivery method: Design-bid-build.

 

See all of the 2017 Reconstruction Award winners here

Related Stories

Reconstruction Awards | Nov 27, 2018

Bedford Square: Revivifying urbanity

A suburban mixed-use redevelopment restores ‘the lost art of living closely.'

Reconstruction Awards | Nov 26, 2018

Yarn works: Neverending yarn

111-year-old mill becomes a mixed-income multifamily community.

Reconstruction Awards | Nov 20, 2018

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.

Reconstruction Awards | Nov 19, 2018

Kehoe Iron Works: Industrial strength makeover

A project team turns a toxic site into a civic treasure.

Reconstruction Awards | Nov 19, 2018

Weiser Hall, University of Michigan: Campus upgrade

A Mid-century building becomes home to a new International Institute.

Reconstruction Awards | Nov 16, 2018

Mass MoCA Building 6: The Robert W. Wilson Building

A textile mill becomes an arts center that energizes a New England town and its region.

Reconstruction Awards | Nov 15, 2018

Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

Library expansion reinforces Colorado College’s commitment to carbon neutrality.

Reconstruction Awards | Nov 14, 2018

National Arts Centre: O, Canada

Three new wings and a flashy AV display add luster to the nation’s cultural gem.

Reconstruction Awards | Nov 13, 2018

20 Times Square: Conquering Times Square

The 20 Times Square mixed-used project at the corner of 47th and Seventh Avenue is indicative of the great lengths Building Teams will go in order to maximize real estate and media opportunities in Times Square.

Reconstruction Awards | Nov 12, 2018

Crosstown Concourse: An 'organic' urban village

Memphians band together to rebuild a gigantic Sears distribution facility into a multifaceted community crossroads.

boombox1
boombox2
native1

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021