HKS used its ARCHengine virtual environment to allow season ticket holders to see different views and angles of the $1 billion Cowboys stadium project. |
4. Architectural Visualization through Gaming Technology
ARCHengine was able to show different views
from different seats and allow potential season ticket holders to walk, or fly, through the stadium. Now, other visualization programs are following Carmichael's lead and using gaming engines to show architectural design.5. Free Online Design Tool for Energy Estimating and Evaluation
To help its 1,500-plus architects design energy-efficient buildings toward meeting AIA's 2030 Challenge, Perkins+Will in April launched an online energy estimating and evaluation tool for new construction and retrofit projects. The firm made the tool available to the public for free at http://2030e2.perkinswill.com.
The 2030 e2 Energy Estimating Tool allows users to set targets in four key areas—energy efficiency, on-site renewable energy, grid-supplied renewable energy, and green power offsets—and assess a building's design against the goals of the 2030 Challenge, which calls for an immediate 50% reduction in carbon emissions of buildings and carbon neutrality by 2030.
Plug in the project name, location, and start date, as well as key energy-related information such as regional fuel mix and baseline energy use for the area, and the tool automatically tracks progress toward 2030.
"The 2030 e2 Energy Estimating Tool allows designers to explore different percentages of these elements to achieve the 2030 goals," says Doug Pierce, AIA, LEED, senior associate in Perkins+Will's Minneapolis office and developer of the tool. "Additionally, the tool can be used over and over to confirm 2030 compliance throughout the life of the project."This model, seen on the Web in the ICEvision viewer, allows full examination of the architect’s Revit model. The client used the viewer to “fly” up to his office window to see what his sightline would be like during a game. |
6. Easy AutoCAD and Revit File Sharing
An example of how BIM virtual mockups work: The fi rst fi gure shows a point on a roof where a radius needed to intersect with a tangent. However, the meeting point left no room for construction workers to caulk or fl ash the joint. |
The virtual mockup in the second figure shows how JE Dunn and its architect modeled a solution during the design stage that would permit worker access to the point of contention, thus saving a costly change order during construction. |
7. BIM Virtual Mockups Found to be Less Expensive than Physical Mockups
BD+C's Giants BIM adoption list
) is also using 3D models for constructability analysis, including field conditions. All information (even 2D CAD) that JE Dunn receives from their architects on big projects is put into a 3D model. From there, virtual mockups are created to make sure construction conditions, such as room for a ladder and a worker to flash or caulk a joint, are checked out and confirmed to be buildable (see example below).With Double-Take data backup, Gould Evans’s main server is in constant contact with an SRO image server. Double-Take replicates and compresses the backup data to take up less space. |
8. Backup Software Saves Data, Money at Gould Evans
Gould Evans needed to trim the cost of its tape-only data storage and backup system. IT manager Chet LaBruyere wanted to improve the accessibility of the system to all 150 Gould Evans employees in the firm's five offices—Kansas City, Mo., Lawrence, Kan., Phoenix, Tampa, and San Francisco—and reduce the risk of data loss between them. After testing several systems, LaBruyere decided to go with Riverbed WAN technology and data replication software from Double-Take. This solution enabled Gould Evans to store all of its backed-up data on one SRO image server accessible to all offices. Double-Take's replication software is hardware agnostic, so it can back up work from Mac, LINUX, or Windows computers. The new system reduces backup labor from 36 human-hours a week to one or two human-hours a week and saves $55,250 a year, plus another $8,400 in annual savings in tape media. Double-Take's system has reduced the total amount of data on Gould Evans's servers by 52% while more than doubling their WAN's bandwidth capacity.
Related Stories
Sponsored | HVAC | Feb 3, 2020
Reliable Building Systems Increase Net Operating Income by Retaining Tenants
Tenants increasingly expect a well-crafted property that feels unique, authentic, and comfortable—with technologically advanced systems and spaces that optimize performance and encourage collaboration and engagement. The following guidance will help owners and property managers keep tenants happy.
Building Technology | Jan 7, 2020
Tariff whiplash for bifacial solar modules
Bifacial solar systems offer many advantages over traditional systems.
Sponsored | HVAC | Jan 6, 2020
Maximize Energy Efficiency in Class A Office Buildings With Modern Building Systems
Energy-efficient building design starts with the building envelope, but the building systems have a tremendous impact on energy use as well.
75 Top Building Products | Dec 16, 2019
Top Building Systems Products for 2019
FabricAir’s ceiling-hung fabric duct and Ellumi Lighting’s bacteria-killing lights are among the 13 new building systems products to make Building Design+Construction's 2019 101 Top Products report.
75 Top Building Products | Dec 12, 2019
Top Building Envelope Products for 2019
Sto's beetle-inspired exterior coating and Dörken Systems' UV-resistant vapor-permeable barrier are among the 28 new building envelope products to make Building Design+Construction's 2019 101 Top Products report.
Energy Efficiency | Aug 8, 2019
Florida’s first net-zero K-12 school opens
The building is distinguished by its rooftop solar array and its air-tight envelope.
Energy Efficiency | Dec 5, 2018
Harvard debuts HouseZero as a possible response to making existing buildings more efficient
Hundreds of embedded sensors will inform energy use reduction research.
Sustainability | Sep 10, 2018
At Penn State, sustainability is more than a goal
The university, encompassing 13 colleges and 24 campuses, adheres to protocols established by the UN.
Energy | Aug 6, 2018
Will California lead the way to energy independence?
The architecture, engineering, and construction industry will have to make major adjustments in the years ahead now that many state, city and local governments are getting serious about creating a carbon neutral buildings sector.
Sponsored | Energy Efficiency | Jul 2, 2018
Going solar has never been easier
There is an efficient system for mounting solar panels to roofs and turning roof real estate into raw power.