HKS used its ARCHengine virtual environment to allow season ticket holders to see different views and angles of the $1 billion Cowboys stadium project. |
4. Architectural Visualization through Gaming Technology
ARCHengine was able to show different views
from different seats and allow potential season ticket holders to walk, or fly, through the stadium. Now, other visualization programs are following Carmichael's lead and using gaming engines to show architectural design.5. Free Online Design Tool for Energy Estimating and Evaluation
To help its 1,500-plus architects design energy-efficient buildings toward meeting AIA's 2030 Challenge, Perkins+Will in April launched an online energy estimating and evaluation tool for new construction and retrofit projects. The firm made the tool available to the public for free at http://2030e2.perkinswill.com.
The 2030 e2 Energy Estimating Tool allows users to set targets in four key areasâenergy efficiency, on-site renewable energy, grid-supplied renewable energy, and green power offsetsâand assess a building's design against the goals of the 2030 Challenge, which calls for an immediate 50% reduction in carbon emissions of buildings and carbon neutrality by 2030.
Plug in the project name, location, and start date, as well as key energy-related information such as regional fuel mix and baseline energy use for the area, and the tool automatically tracks progress toward 2030.
"The 2030 e2 Energy Estimating Tool allows designers to explore different percentages of these elements to achieve the 2030 goals," says Doug Pierce, AIA, LEED, senior associate in Perkins+Will's Minneapolis office and developer of the tool. "Additionally, the tool can be used over and over to confirm 2030 compliance throughout the life of the project."This model, seen on the Web in the ICEvision viewer, allows full examination of the architectâs Revit model. The client used the viewer to âflyâ up to his office window to see what his sightline would be like during a game. |
6. Easy AutoCAD and Revit File Sharing
An example of how BIM virtual mockups work: The fi rst fi gure shows a point on a roof where a radius needed to intersect with a tangent. However, the meeting point left no room for construction workers to caulk or fl ash the joint. |
The virtual mockup in the second figure shows how JE Dunn and its architect modeled a solution during the design stage that would permit worker access to the point of contention, thus saving a costly change order during construction. |
7. BIM Virtual Mockups Found to be Less Expensive than Physical Mockups
BD+C's Giants BIM adoption list
) is also using 3D models for constructability analysis, including field conditions. All information (even 2D CAD) that JE Dunn receives from their architects on big projects is put into a 3D model. From there, virtual mockups are created to make sure construction conditions, such as room for a ladder and a worker to flash or caulk a joint, are checked out and confirmed to be buildable (see example below).With Double-Take data backup, Gould Evansâs main server is in constant contact with an SRO image server. Double-Take replicates and compresses the backup data to take up less space. |
8. Backup Software Saves Data, Money at Gould Evans
Gould Evans needed to trim the cost of its tape-only data storage and backup system. IT manager Chet LaBruyere wanted to improve the accessibility of the system to all 150 Gould Evans employees in the firm's five officesâKansas City, Mo., Lawrence, Kan., Phoenix, Tampa, and San Franciscoâand reduce the risk of data loss between them. After testing several systems, LaBruyere decided to go with Riverbed WAN technology and data replication software from Double-Take. This solution enabled Gould Evans to store all of its backed-up data on one SRO image server accessible to all offices. Double-Take's replication software is hardware agnostic, so it can back up work from Mac, LINUX, or Windows computers. The new system reduces backup labor from 36 human-hours a week to one or two human-hours a week and saves $55,250 a year, plus another $8,400 in annual savings in tape media. Double-Take's system has reduced the total amount of data on Gould Evans's servers by 52% while more than doubling their WAN's bandwidth capacity.
Related Stories
Sponsored | Metals | Jul 20, 2015
Life cycle assessment, and why you should care
LCA is a way of quantifying the environmental impact generated by the manufacture and delivery of a product.
Sponsored | Energy Efficiency | Jun 30, 2015
Which Is More Efficient: Wood Walls or Steel and Masonry With Continuous Insulation?
By nature, wood has nearly four times the thermal resistance of steel or masonry
Sponsored | Transit Facilities | Jun 15, 2015
Success through teamwork for landmark California project
The Anaheim Regional Transportation Intermodal Center (ARTIC) is the Grand Central Station of the future
Green | Jun 9, 2015
Fuel cell technology makes its way into energy generation
Demand for fuel cells, while modest, is growing, and cost savings are getting noticed.
Cultural Facilities | Apr 16, 2015
Milwaukeeâs Lakeshore State Park visitor center will be âoff the gridâ
The plans also include a built-in wastewater treatment system and rainwater collection.
Green | Apr 7, 2015
USGBC survey shows Fortune 200 companies prioritize green building
The worldâs top-performing companies are prioritizing sustainability as part of their corporate social responsibility efforts, and a majority of them are using LEEDÂ to achieve their goals, according to the new survey.
Codes and Standards | Apr 6, 2015
DOE releases Better Buildings Workforce Guidelines
The guidelines are aimed at strengthening and streamlining commercial building workforce training and certification programs for workers in energy auditing, building commissioning, building operations, and energy management.