flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Green Bay Packers to start construction on a business district near Lambeau Field this fall

Sports and Recreational Facilities

Green Bay Packers to start construction on a business district near Lambeau Field this fall

Flush with cash, the NFL team is kicking in about half of the $130 million for the 20-acre project’s first phase.


By John Caulfield, Senior Editor | August 24, 2015
Green Bay Packers to start construction on a business district near Lambeau Field this fall

Image: Titletown District, all renderings courtesy Green Bay Packers (via Green Bay Press Gazette)

This fall, the Green Bay Packers will break ground on Titletown District, a mixed-use development west of the NFL team's home of Lambeau Field. When completed in the fall of 2017, the first phase of Titletown District will include a hotel, a sports medicine center, a restaurant/brewery, and a 10-acre public plaza.

The Milwaukee Business Journal reports that the first phase of this project is expected to cost between $120 million and $130 million, with the Packers contributing $65 million of that total.

For several years, the Wisconsin-based team has been acquiring land in town and demolishing buildings in preparation for starting Titletown District. The first tenant, a 100,000-sf Cabela’s sporting goods outlet the retailer developed with the team, opened in July 2014 and drew 2.8 million visitors in its first 12 months in business.

The Journal reports that this fall the Packers and its Building Team—which includes Sterling Project Development, a New York real estate advisory firm; Rossetti, a Detroit architectural design and planning firm; and Biederman Redevelopment Ventures, a New York design consultant with expertise in public-spaces and streetscapes—will begin installing infrastructure on eight of the project’s 20 acres for initial tenants that will include a five-story, 150-room, four-diamond hotel to be call Lodge Kohler, which the bath and kitchen fixture supplier Kohler Co. will build and operate.

The hotel will not only provide rooms for fans attending Packers’ games, but should also benefit from the 700 events the team conducts annually.  

Other initial tenants will include a 20,000-sf Hinterland restaurant/brewery; and a 30,000-sf sports medicine facility called Bellin Health, which will feature lab, X-ray, and MRI services. The Packers’ team physician Dr. Patrick McKenzie will staff the clinic.

The publicly owned Packers reported $375 million in revenue for fiscal year 2015, up 16%. Team president Mark Murphy said the franchise continues to acquire land with an eye toward further regional economic development that could include residential buildings. 

 

Related Stories

Sports and Recreational Facilities | May 1, 2020

DLR Group completes LA Memorial Coliseum Renovation

The work finished prior to the 2019 USC season.

Sports and Recreational Facilities | Apr 27, 2020

Erudite eSports: Colleges build their very own eSports arenas

Universities are building dedicated spaces for eSport athletes to pick up the sticks.

Sports and Recreational Facilities | Feb 27, 2020

Disney to develop private island destination in The Bahamas

This will be Disney’s second private island retreat.  

Sports and Recreational Facilities | Feb 6, 2020

Europe’s first LEGOLAND Water Park is set to open

The water park will be part of Italy’s Gardaland Theme Park in Gardaland, Italy.

GIANTS 19 PREMIUM | Dec 23, 2019

Top 65 Sports Facilities Engineering Firms for 2019

Walter P Moore, Kimley-Horn, ME Engineers, Thornton Tomasetti, and EXP head the rankings of the nation's largest sports facilities sector engineering and engineering/architecture (EA) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

GIANTS 19 PREMIUM | Dec 23, 2019

Top 90 Sports Facilities Architecture Firms for 2019

Populous, HKS, HOK, Gensler, and HNTB top the rankings of the nation's largest sports facilities sector architecture and architecture engineering (AE) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Sports and Recreational Facilities | Dec 6, 2019

An architect in Florence proposes a new soccer stadium as part of a larger urban redevelopment

The owner of Fiorentina, the soccer team, wants to move into a new facility by 2023.

Sports and Recreational Facilities | Nov 22, 2019

HKS designs Team Vitality’s new Paris HQ

The facility is meant to draw in more than just eSports fans.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021