flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Johnsonite features sustainable products

GREENBUILD 2011: Johnsonite features sustainable products


By By BD+C Staff | October 4, 2011
New products from Johnsonite include rubber flooring tiles, treads, wall bases, and more.

 

Johnsonite returns to the Greenbuild International Conference and Expo to highlight several of its environmentally responsible products, discuss environmental practices and initiatives.

Exhibit highlights include:

  • Eco-Naturals Collection: Engineered for greater sustainability in rubber flooring tiles, treads and wall base using significant levels of rapidly renewable and pre-consumer waste stream materials. Eco-Naturals Eco-Shell with Cork contains 2.5% cork and 4.5% percent of walnut shell dust, pre-consumer and rapidly renewable resources. CorkTones contains 2.5% cork. The unique composition of the tiles does not contain phthalates, halogens or chlorine and the product only requires water and a neutral detergent to clean it.
  • Harmonium xf: Made from 95% natural materials such as linseed oil, flax seed, wood and cork—73% of those rapidly renewable—this linoleum product has the highest rapidly renewable content in the industry and offers one of the lowest life-cycle costs available.
  • Masquerade Contoured Wall Base: A unique Millwork finishing border with the look of exotic wood and expensive stone. There are 12 wood grain options and 11 stone options as well as options for customization. The product is FloorScore certified, can contribute LEED points, contains 14 percent pre-consumer recycled materials and is recyclable. BD+C

Related Stories

Contractors | Apr 20, 2015

Too many construction projects don’t meet owners’ expectations: KPMG report

Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.     

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

Museums | Apr 16, 2015

SANAA and Snøhetta tie at first place for Budapest museum bid

The two firms submitted designs for the New National Gallery and Ludwig Museum, one of five planned museums to be constructed in a park just outside the urban center of Hungary’s capital. 

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

Architects | Apr 14, 2015

Jeanne Gang, Bjarke Ingels among participants for inaugural Chicago Architecture Biennial

Some big names include Bjarke Ingels Group and Studio Gang Architects

Sports and Recreational Facilities | Apr 13, 2015

USTA breaks ground on what will be the country’s largest tennis complex

The 63-acre facility is being positioned as a cornerstone for a sports innovation and performance district in Lake Nona, Fla., a 7,000-acre master planned community that continues to expand.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021