flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Johnsonite features sustainable products

GREENBUILD 2011: Johnsonite features sustainable products


By By BD+C Staff | October 4, 2011
New products from Johnsonite include rubber flooring tiles, treads, wall bases, and more.

 

Johnsonite returns to the Greenbuild International Conference and Expo to highlight several of its environmentally responsible products, discuss environmental practices and initiatives.

Exhibit highlights include:

  • Eco-Naturals Collection: Engineered for greater sustainability in rubber flooring tiles, treads and wall base using significant levels of rapidly renewable and pre-consumer waste stream materials. Eco-Naturals Eco-Shell with Cork contains 2.5% cork and 4.5% percent of walnut shell dust, pre-consumer and rapidly renewable resources. CorkTones contains 2.5% cork. The unique composition of the tiles does not contain phthalates, halogens or chlorine and the product only requires water and a neutral detergent to clean it.
  • Harmonium xf: Made from 95% natural materials such as linseed oil, flax seed, wood and cork—73% of those rapidly renewable—this linoleum product has the highest rapidly renewable content in the industry and offers one of the lowest life-cycle costs available.
  • Masquerade Contoured Wall Base: A unique Millwork finishing border with the look of exotic wood and expensive stone. There are 12 wood grain options and 11 stone options as well as options for customization. The product is FloorScore certified, can contribute LEED points, contains 14 percent pre-consumer recycled materials and is recyclable. BD+C

Related Stories

| Feb 29, 2012

Report says BIPV glass market to reach $6.4 billion by 2016

The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021