flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011


By By BD+C Staff | October 5, 2011
The Kohler booth is made up of four distinct suites: three common commercial spaces a hotel restroom, a stadium restroom, and

From the reclaimed barn wood building materials to the soy ink signage, the new booth created by Kohler Co. for the Greenbuild International Conference and Expo was planned to leave a big impression while following the U.S. Green Building Council’s green tradeshow guidelines.

Inside the booth are many of the company’s innovative water-saving products, showcased in the kind of gracious, forward-thinking setting for which Kohler has become renowned.

“Greenbuild is about innovation in all aspects of all processes. In keeping with that, we looked at how we planned and executed a tradeshow in a completely new way,” commented Rob Zimmerman, engineering manager for water conservation and sustainability at Kohler. “To be genuinely conscientious, we had to analyze every element right down to what happens to the booth and its contents after the show is over.”

The Kohler booth is made up of four distinct suites: three common commercial spaces (a hotel restroom, a stadium restroom, and a healthcare restroom) and a residential space to show visitors how they can impact the environment by using water-conserving technologies and sustainable products. The attention to the materials used for these vignettes and the conservational nature of the overall display were planned out to the smallest details.

All displays were designed to fit into one 53-foot truck to limit the transportation costs.

The structures are built from reclaimed barn wood, and portions of the booth will be reused for other shows.

The products will be donated after the show and all the other building materials were designed for repackaging upon return shipment. BD+C

Related Stories

Healthcare Facilities | Jun 20, 2022

Is telehealth finally mainstream?

After more than a century of development, telehealth has become a standard alternative for many types of care.

Building Team | Jun 20, 2022

Andres Caballero Appointed President of Uponor North America

Uponor Corporation (Uponor) has named Andres Caballero president of its Building Solutions – North America division and a member of the Executive Committee at Uponor.

| Jun 20, 2022

An architectural view of school safety and security

With threats ranging from severe weather to active shooters, school leaders, designers, and security consultants face many challenges in creating safe environments that allow children to thrive.

School Construction | Jun 20, 2022

A charter high school breaks ground in L.A.’s Koreatown

A new charter school has broken ground in Los Angeles’ Koreatown neighborhood.

Building Team | Jun 17, 2022

Data analytics in design and construction: from confusion to clarity and the data-driven future

Data helps virtual design and construction (VDC) teams predict project risks and navigate change, which is especially vital in today’s fluctuating construction environment.

Sports and Recreational Facilities | Jun 17, 2022

U. of Georgia football facility expansion provides three floors for high-performance training

A major expansion of the University of Georgia’s football training facility has been completed.

Building Team | Jun 16, 2022

Hybrid work expected to reduce office demand by 9%

Businesses are slowly but consistently transitioning to a permanent hybrid work environment, according to a senior economist at Econometric Advisors.

Building Team | Jun 16, 2022

USGBC announces more than 23 million square feet of LEED certified net zero space

Today, the U.S. Green Building Council announced nearly 100 net zero certifications earned under the LEED Zero program, representing more than 23 million square feet of space.

AEC Business Innovation | Jun 15, 2022

Cognitive health takes center stage in the AEC industry

Two prominent architecture firms are looking to build on the industry’s knowledge base on design’s impact on building occupant health and performance with new research efforts.

Market Data | Jun 15, 2022

ABC’s construction backlog rises in May; contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator increased to nine months in May from 8.8 months in April, according to an ABC member survey conducted May 17 to June 3. The reading is up one month from May 2021.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021