flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Otis Elevator introduces energy-efficient escalator

GREENBUILD 2011: Otis Elevator introduces energy-efficient escalator


By By BD+C Staff | October 7, 2011
The NCE escalator is the first to offer as standard a complete, all-in-one package of green features, including regenerative d

Otis Elevator Co. announced the enhancement of its NCE escalator, the first to offer as standard a complete, all-in-one package of “green” features, including regenerative drives, power standby features, LED lighting, and high-efficiency lubrication.

Otis also announced that it is well ahead of its sustainability objectives established under the company’s "The Way to Green" program, launched in February 2011 as a major global environmental commitment spanning every aspect of its operations.

The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits, including:

  • A ReGen drive that captures energy generated by the escalator on the way down and delivers it back to the building for use by other systems, reducing energy consumption by up to 45 percent compared to traditional escalators;
  • Power standby technology, which uses sensors that detect when passengers are not on the escalator, prompting the escalator to slow down and thereby use less energy;
  • LED lighting that uses 30% less energy than traditional lighting; and
  • High-efficiency lubrication that uses 98% less oil than a traditional lubrication system. BD+C

Related Stories

| Jun 11, 2012

Historic church gains energy efficiency, retains aesthetics with architecturally rated windows

New windows would need to not only stand the test of time, but also accommodate the aesthetics of an architecturally historic church.

| Jun 11, 2012

Genivar and WSP Group join forces

Genivar concurrently announces a $225 million public bought deal of subscription receipts, a $197 million private placement of subscription receipts and new credit facilities.

| Jun 11, 2012

SimplexGrinnell highlights integrated suite of web-based technologies at NFPA Expo

eservices platform uses the power of the Internet to deliver more value to customers.

| Jun 11, 2012

Reed Construction announces new hire and promotion

Reed Construction hired Augie Insalaco as a project manager and promoted Matt Mahoney from project intern to project engineer.

| Jun 11, 2012

Hill International selected as CM for Porto Arabia Towers in Qatar

The complex is a mixed-use development featuring both residential and commercial properties.

| Jun 8, 2012

Living Building Challenge wins the 2012 Buckminster Fuller Challenge

The Living Building Challenge was chosen from a pool of 122 of entries from around the world.

| Jun 8, 2012

Nauset Construction completing sustainable dorm for Brooks School

Student input on green elements provides learning experience.

| Jun 8, 2012

Skyline Construction names Millitello president

Millitello is a 31-year veteran who has overseen the construction of campus-size projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021