flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Transparent concrete makes its North American debut at Greenbuild

GREENBUILD 2011: Transparent concrete makes its North American debut at Greenbuild


By By BD+C Staff | October 7, 2011
Precast, transparent concrete panels can brighten any room and allow people to see images and objects behind them.

What if cement could light up a room? i.light precast, transparent concrete panels can brighten any room and allow people to see images and objects behind them.

Making its North American debut at Greenbuild, two i.light precast concrete walls, manufactured by ESSROC Italcementi Group, showcased the innovation of cement and the endless possibilities for interior and exterior applications by builders, designers and architects.

The transparency in cement is achieved via an innovative technology developed by Italcementi Group’s R&D department, in which a new dry ready-mixed product that allows bonding a light-transmitting plastic resin matrix is used. This allows the manufacturing of solid insulated concrete construction panels, which transmit light, both natural and artificial. The panels are guaranteed to last as long as a panel made from traditional cement material.

The result of the transparent panels is simply brilliant as they create a sequence of lights and shadows in constant evolution throughout the day. The transparent effect is more evident when it is dark and seen from the outside. The panels allow interior lights to filter through, from inside. During the day, exterior light filters in, showing the changes in the levels of daylight. The capability to transmit light can also make it possible to use less electricity, potentially contributing to energy savings. BD+C

Related Stories

| Dec 9, 2012

Greenzone pop quiz

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

| Dec 9, 2012

Modular classroom building makes the grade

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

| Dec 9, 2012

14 great solutions

Welcome to the third installment of Building Design+Construction’s “Great Solutions,” highlighting 14 innovative technologies and products that you can put to work in your next project.

| Dec 9, 2012

AEC professionals cautiously optimistic about commercial construction in ’13

Most economists say the U.S. is slowly emerging from the Great Recession, a view that was confirmed to some extent by an exclusive survey of 498 BD+C subscribers whose views we sought on the commercial construction industry’s outlook on business prospects for 2013.

| Dec 7, 2012

Structural glazing sealant protects solar-rooftop stadium in Taiwan

Designers of the Kaohsiung World Games Main Stadium in Gaoxiong, Taiwan, powered by almost 9,000 rooftop solar panels, required an effective panel fixing design offering optimum energy transfer rate, plus thermal and weathertight performance. Dow Corning specialists recommended a four-sided structural sealant solution featuring Dow Corning 983 Structural Glazing Sealant.

| Dec 6, 2012

Ziegler Cooper names Soto as Director of Design, Broadens Design Capabilities

Soto will oversee design efforts, bringing a high level of quality and problem solving capabilities through active engagement with clients and studios firm wide.

| Dec 5, 2012

Gilbane publishes Winter 2012 construction economic report

Report outlines impact of recent events; predicts continued movement, while slow, toward recovery.

| Dec 5, 2012

Gehry-designed New York City tower receives Emporis Skyscraper Award

8 Spruce Street is now the third New York tower to win the Emporis Skyscraper Award.

| Dec 4, 2012

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021