flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: Transparent concrete makes its North American debut at Greenbuild

GREENBUILD 2011: Transparent concrete makes its North American debut at Greenbuild


By By BD+C Staff | October 7, 2011
Precast, transparent concrete panels can brighten any room and allow people to see images and objects behind them.

What if cement could light up a room? i.light precast, transparent concrete panels can brighten any room and allow people to see images and objects behind them.

Making its North American debut at Greenbuild, two i.light precast concrete walls, manufactured by ESSROC Italcementi Group, showcased the innovation of cement and the endless possibilities for interior and exterior applications by builders, designers and architects.

The transparency in cement is achieved via an innovative technology developed by Italcementi Group’s R&D department, in which a new dry ready-mixed product that allows bonding a light-transmitting plastic resin matrix is used. This allows the manufacturing of solid insulated concrete construction panels, which transmit light, both natural and artificial. The panels are guaranteed to last as long as a panel made from traditional cement material.

The result of the transparent panels is simply brilliant as they create a sequence of lights and shadows in constant evolution throughout the day. The transparent effect is more evident when it is dark and seen from the outside. The panels allow interior lights to filter through, from inside. During the day, exterior light filters in, showing the changes in the levels of daylight. The capability to transmit light can also make it possible to use less electricity, potentially contributing to energy savings. BD+C

Related Stories

| Oct 27, 2011

iProspect selects VLK Architects for new office design

Company growth prompted iProspect to make the decision to move to a new space.

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021