flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field


By By BD+C Staff | October 7, 2011
UL Environment, Inc., released a White Paper to help educate all stakeholders about Environmental Product Declarations (EPDs) an

UL Environment Inc. released a White Paper to help educate all stakeholders about Environmental Product Declarations (EPDs) and help clarify the role of the EPD Program Operator. The new guidance document, “Transparency and the Role of Environmental Product Declarations,” accompanies the announcement of newly certified EPDs for Interface and Kingspan Insulated Metal Panels and release of a Thermal Building Envelope Insulation Product Category Rule.

The report – available here – provides guidance on:

  • Market demand for EPDs;
  • ISO 14025 compliant EPD creation process;
  • Importance of  life cycle analysis in the EPD creation process;
  • Why Product Category Rules (PCRs) needed;
  • Necessity for PCR harmonization;
  • Role of the EPD Program Operator; and
  • What’s next for EPDs, including the management of public data.

An EPD is an internationally accepted, third-party reviewed report detailing a product’s environmental impacts throughout its lifecycle, and often include additional performance, health, and company information. EPDs promote transparency and facilitate comparison of impacts among products in the same category.

Life cycle-based assessment tools are rapidly being embraced by the construction and building industry as an emerging component of green building certification processes. EPDs are currently rewarded by various green building rating systems such as CHPS and BREEAM. The USGBC recently started to recognize EPDs through Pilot Credit 43 and the draft version of the LEED 2012 includes credits that encourage the use of EPDs. BD+C

Related Stories

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021