flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GREENBUILD 2011

GREENBUILD 2011


By By BD+C Staff | October 4, 2011
BD+C is providing daily news updates from Greenbuild 2011, Oct. 4-7, 2011 in Toronto. Be sure to check here for daily updates.

BD+C is providing daily news updates from Greenbuild 2011, Oct. 4-7, in Toronto. Be sure to check here for daily updates.

 

GREENBUILD 2011, OCTOBER 7, 2011

+ Demand response partnership program announced at Greenbuild 2011
Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings. For more information, click here

+ Otis Elevator announces new contracts for sustainable building projects
Wins reinforce Otis’ position as leader in energy-efficient products. For more information, click here.

+ UL Environment releases industry-wide sustainability requirements for doors
ASSA ABLOY Trio- E certified to robust criteria for materials, energy and water use, manufacturing, performance, and product stewardship. For more information, click here.

+ UL Environment clarifies emerging environmental product declaration field
White Paper Defines EPD, details development process and identifies emerging trends for manufacturers, architects, designers, and buyers. For more information, click here.

+ Otis Elevator introduces energy-efficient escalator
The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits. For more information, click here.

+ Schools program receives grant to track student conservation results
To track results they will use the newly developed Sustainability Dashboard, a unique web-based service that makes tracking sustainability initiatives affordable and easy. For more information, click here.

+ Transparent Concrete Makes its North American Debut at Greenbuild
Concrete panels on displayed at the Cement Association of Canada exhibit. For more information, click here.

 

GREENBUILD 2011, OCTOBER 6, 2011

+ Greenbuild: Growing Green Building Market Supports 661,000 Green Jobs in the U.S.
Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard. For more information, click here.

+ Dow Corning feature new silicone weather barrier sealant
Dow Corning 758 sealant used in GreenZone modular high-performance medical facility. For more information, click here.

+ NEXT Living EcoSuite showcased
Tridel teams up with Cisco and Control4 to unveils the future of green condo living in Canada. For more information, click here.

+ Kingspan Insulated Panels North America spotlights first-of-its-kind Environmental Product Declaration
Announces updates to Path to NetZero. For more information, click here.

 

GREENBUILD 2011, OCTOBER 5, 2011

+ Johnson Controls announces Panoptix, A new approach to building efficiency
Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market. For more information, click here.

+ An architectural game changer
Interactive modeling software transforms the design­build process. For more information, click here

+ Tile manufacturer attains third-party certification for waste recycling processes
Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware. For more information, click here

+ Sustainable construction should stress durability as well as energy efficiency
There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. To learn more, click here

+ Solar PV canopy system expanded for architectural market
Turnkey systems create an aesthetic architectural power plant. For more information, click here

+ Kohler builds sustainable booth at Greenbuild 2011
In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, Kohler highlights its new products with ecological awareness. To learn more, click here.

+ Brick offers growing options for sustainable building design
Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification. For more information, click here.

+ Roof hatch designed for energy efficiency
The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. For more information, click here.

 

GREENBUILD 2011, OCTOBER 4, 2011

+ Wall protection line now eligible to contribute to LEED Pilot Credit 43
The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification. For more information, click here.

+ Mythic Paint launches two new paint products
A high performance paint, and a combination paint and primer now available. For more information, click here.

+ Two new recycled glass products announced
The two collections offer both larger and smaller particulates. For more information, click here.

+ Ready-to-use wood primer unveiled
Maintains strong UV protection, clarity even with application of lighter, natural wood tones. For more information, click here.

+ Nearly seamless highly insulated glass curtain-wall system introduced
Low insulation value reflects value of entire curtain-wall system. For more information, click here.

+ Large diameter polypropylene-random pipe unveiled
Available in North America for large scale piping applications including high-rise buildings, large chilled water systems, district energy, and water mains. For more information, click here.

+ Johnsonite features sustainable products at Greenbuild 2011
Products include rubber flooring tiles, treads, wall bases, and more. To learn more, click here.

+ Methods, impacts, and opportunities in the concrete building life cycle
Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete. For more information, click here.

Related Stories

Women in Design+Construction | May 28, 2024

Commerce Department launches Million Women in Construction Community Pledge

The U.S. Department of Commerce launched its Million Women in Construction Community Pledge this month to boost the ranks of women in construction companies. Federal investments are creating a construction boom that is increasing job opportunities for construction and trade workers.

Laboratories | May 24, 2024

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 

MFPRO+ News | May 24, 2024

Austin, Texas, outlaws windowless bedrooms

Austin, Texas will no longer allow developers to build windowless bedrooms. For at least two decades, the city had permitted developers to build thousands of windowless bedrooms.

Resiliency | May 24, 2024

As temperatures underground rise, so do risks to commercial buildings

Heat created by underground structures is increasing the risk of damage to buildings, recent studies have found. Basements, train tunnels, sewers, and other underground systems are making the ground around them warmer, which causes soil, sand, clay and silt to shift, settle, contract, and expand.

Sports and Recreational Facilities | May 23, 2024

The Cincinnati Open will undergo a campus-wide renovation ahead of the expanded 2025 tournament

One of the longest-running tennis tournaments in the country, the Cincinnati Open will add a 2,000-seat stadium, new courts and player center, and more greenspace to create a park-like atmosphere.

Mass Timber | May 22, 2024

3 mass timber architecture innovations

As mass timber construction evolves from the first decade of projects, we're finding an increasing variety of mass timber solutions. Here are three primary examples.

MFPRO+ News | May 21, 2024

Massachusetts governor launches advocacy group to push for more housing

Massachusetts’ Gov. Maura Healey and Lt. Gov. Kim Driscoll have taken the unusual step of setting up a nonprofit to advocate for pro-housing efforts at the local level. One Commonwealth Inc., will work to provide political and financial support for local housing initiatives, a key pillar of the governor’s agenda.

Building Tech | May 21, 2024

In a world first, load-bearing concrete walls built with a 3D printer

A Germany-based construction engineering company says it has constructed the world’s first load-bearing concrete walls built with a 3D printer. Züblin built a new warehouse from a single 3D print for Strabag Baumaschinentechnik International in Stuttgart, Germany using a Putzmeister 3D printer. 

MFPRO+ News | May 21, 2024

Baker Barrios Architects announces new leadership roles for multifamily, healthcare design

Baker Barrios Architects announced two new additions to its leadership: Chris Powers, RA, AIA, NCARB, EDAC, as Associate Principal and Director (Healthcare); and Mark Kluemper, AIA, NCARB, as Associate Principal and Technical Director (Multifamily).

MFPRO+ News | May 20, 2024

Florida condo market roiled by structural safety standards law

A Florida law enacted after the Surfside condo tower collapse is causing turmoil in the condominium market. The law, which requires buildings to meet certain structural safety standards, is forcing condo associations to assess hefty fees to make repairs on older properties. In some cases, the cost per unit runs into six figures.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021