BD+C is providing daily news updates from Greenbuild 2011, Oct. 4-7, in Toronto. Be sure to check here for daily updates.
GREENBUILD 2011, OCTOBER 7, 2011
+ Demand response partnership program announced at Greenbuild 2011
Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings. For more information, click here.
+ Otis Elevator announces new contracts for sustainable building projects
Wins reinforce Otis’ position as leader in energy-efficient products. For more information, click here.
+ UL Environment releases industry-wide sustainability requirements for doors
ASSA ABLOY Trio- E certified to robust criteria for materials, energy and water use, manufacturing, performance, and product stewardship. For more information, click here.
+ UL Environment clarifies emerging environmental product declaration field
White Paper Defines EPD, details development process and identifies emerging trends for manufacturers, architects, designers, and buyers. For more information, click here.
+ Otis Elevator introduces energy-efficient escalator
The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits. For more information, click here.
+ Schools program receives grant to track student conservation results
To track results they will use the newly developed Sustainability Dashboard, a unique web-based service that makes tracking sustainability initiatives affordable and easy. For more information, click here.
+ Transparent Concrete Makes its North American Debut at Greenbuild
Concrete panels on displayed at the Cement Association of Canada exhibit. For more information, click here.
GREENBUILD 2011, OCTOBER 6, 2011
+ Greenbuild: Growing Green Building Market Supports 661,000 Green Jobs in the U.S.
Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard. For more information, click here.
+ Dow Corning feature new silicone weather barrier sealant
Dow Corning 758 sealant used in GreenZone modular high-performance medical facility. For more information, click here.
+ NEXT Living EcoSuite showcased
Tridel teams up with Cisco and Control4 to unveils the future of green condo living in Canada. For more information, click here.
+ Kingspan Insulated Panels North America spotlights first-of-its-kind Environmental Product Declaration
Announces updates to Path to NetZero. For more information, click here.
GREENBUILD 2011, OCTOBER 5, 2011
+ Johnson Controls announces Panoptix, A new approach to building efficiency
Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market. For more information, click here.
+ An architectural game changer
Interactive modeling software transforms the designbuild process. For more information, click here.
+ Tile manufacturer attains third-party certification for waste recycling processes
Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware. For more information, click here.
+ Sustainable construction should stress durability as well as energy efficiency
There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. To learn more, click here.
+ Solar PV canopy system expanded for architectural market
Turnkey systems create an aesthetic architectural power plant. For more information, click here.
+ Kohler builds sustainable booth at Greenbuild 2011
In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, Kohler highlights its new products with ecological awareness. To learn more, click here.
+ Brick offers growing options for sustainable building design
Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification. For more information, click here.
+ Roof hatch designed for energy efficiency
The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. For more information, click here.
GREENBUILD 2011, OCTOBER 4, 2011
+ Wall protection line now eligible to contribute to LEED Pilot Credit 43
The Cradle-to-Cradle Certified Wall Protection Line offers an additional option for customers to achieve LEED project certification. For more information, click here.
+ Mythic Paint launches two new paint products
A high performance paint, and a combination paint and primer now available. For more information, click here.
+ Two new recycled glass products announced
The two collections offer both larger and smaller particulates. For more information, click here.
+ Ready-to-use wood primer unveiled
Maintains strong UV protection, clarity even with application of lighter, natural wood tones. For more information, click here.
+ Nearly seamless highly insulated glass curtain-wall system introduced
Low insulation value reflects value of entire curtain-wall system. For more information, click here.
+ Large diameter polypropylene-random pipe unveiled
Available in North America for large scale piping applications including high-rise buildings, large chilled water systems, district energy, and water mains. For more information, click here.
+ Johnsonite features sustainable products at Greenbuild 2011
Products include rubber flooring tiles, treads, wall bases, and more. To learn more, click here.
+ Methods, impacts, and opportunities in the concrete building life cycle
Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete. For more information, click here.
Related Stories
Student Housing | Apr 19, 2024
$115 million Cal State Long Beach student housing project will add 424 beds
A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.
Construction Costs | Apr 18, 2024
New download: BD+C's April 2024 Market Intelligence Report
Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.
MFPRO+ New Projects | Apr 16, 2024
Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn
The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.
Construction Costs | Apr 16, 2024
How the new prevailing wage calculation will impact construction labor costs
Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.