flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.


By By BD+C Staff | April 27, 2012
Experts from the EPA, along with architects and builders will present ways to de
Experts from the EPA, along with architects and builders will present ways to design and build water-conscious homes and buildin

The U.S. Environmental Protection Agency (EPA) estimates that at least 36 states will face water shortages by 2013. It’s a problem not limited to the desert Southwest, but stretches to the Midwest, Florida, Georgia and other regions. The EPA’s WaterSense program is designed to decrease indoor and outdoor nonagricultural water use through more efficient products, equipment and programs.

Architects and builders interested in developing more water-efficient buildings can learn the ins-and-outs of the WaterSense program during a series of four free live webinars hosted online at GreenExpo365.com May 9.

Experts from the EPA, along with architects and builders will present ways to design and build water-conscious homes and buildings, and be available to answer questions.

The presentation schedule is:

  • Wednesday, May 9, 8:00 a.m. Pacific / 11:00 a.m. Eastern ?Jonah Schein, EPA WaterSense Program Technical & Certification Coordinator for New Homes: “Design Leads the Way: Why and How Architects Should Design with Water in Mind”
  • Wednesday, May 9, 9:30 a.m. Pacific / 12:30 p.m. Eastern ?Alicia Marrs, EPA WaterSense Program New Homes Partnerships Marketing & Outreach Specialist: “Talk it Up! Communicating the Value of a Water Efficient Home”
  • Wednesday, May 9, 11:00 a.m. Pacific / 2:00 p.m. Eastern ?Amber Lefstead, EPA Water Sense Program Outdoor Coordinator, and Tamara Mittman, EPA Office of Wastewater Management Environmental Engineer: “Water Conservation in the Great Outdoors – Thinking about Landscaping in a New Way”
  • Wednesday, May 9, 1:00 p.m. Pacific / 4:00 p.m. Eastern ?Matt Stevens, Green Zone Home; CR Herro, Meritage Homes, Vice President of Environmental Affairs; and Jonah Schein, EPA WaterSense Program: “WaterSense in Action: Tips and Examples from an Architect, a Builder and a Verifier”

All sessions are free to attend. For more information, visit http://www.greenexpo365.com/en/about/events/upcoming_events_news_feed/may-9-watersense-breakout-session---full-day-educa_h05s6ise.html. BD+C

Related Stories

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

| Oct 13, 2010

Maryland replacement hospital expands care, changes name

The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms, and two cardiac rooms.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021