flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Greenhorne & O’Mara signs letter of intent to join Stantec

Greenhorne & O’Mara signs letter of intent to join Stantec

Acquisitions of C3TS and Architecture 2000 also completed.


By Posted by Tim Gregorski, Senior Editor | December 4, 2012

North American design firm Stantec announced plans to acquire Mid-Atlantic-based engineering firm Greenhorne & O’Mara. The multidiscipline, 520-person firm will expand Stantec’s presence and services across the U.S. Atlantic coast, particularly in the transportation sector and with the US federal government. The transaction is expected to close by the end of the year, marking the third firm to join Stantec in the last quarter of 2012.

Headquartered in Laurel, Md., with 16 offices spread throughout the Mid-Atlantic and Southeast regions, Greenhorne & O’Mara specializes in the design of transportation facilities and other infrastructure, including highway and bridge design, traffic engineering, master planning and landscape architecture, structural engineering, U.S. Department of Defense services, and utilities design. Their work also includes particular expertise in water resource projects with U.S. federal agencies, such as flood hazard mitigation and floodplain mapping, National Environmental Policy Act (NEPA) compliance, wetlands delineation and permitting, environmental impact statements, and stormwater management.

Stantec also announced the completion of its acquisition of C3TS, a Florida engineering and design firm with 150 employees. The move established a much stronger presence for Stantec on Florida’s Atlantic coast, bringing total staff in the state to more than 350 in 12 offices. +

Related Stories

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Energy performance starts at the building envelope

Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 10, 2011

BIM tools to make your project easier to manage

Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.

| Dec 9, 2011

BEST AEC FIRM 2011: MHTN Architects

Serving Utah for nearly eight decades.

| Dec 9, 2011

BEST AEC FIRM 2011: HMC Architects

Fostering a tradition of collaboration.

| Dec 9, 2011

BEST AEC FIRM 2011: Gensler

Developing talent on a global scale.

| Dec 9, 2011

BEST AEC FIRM 2011: Chapman Construction/Design

Taking sustainable practices to heart.

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021