flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gregory Hodkinson appointed head of Arup Group

Gregory Hodkinson appointed head of Arup Group

Gregory Hodkinson joined Arup in 1972, having been inspired by the firm's work on the Sydney Opera House. 


By Arup  | April 9, 2014
Arup announced that Gregory Hodkinson will take over the role of Chairman. Hodkinson is joined by Deputy Chairmen Tristram Carfrae and David Whittleton. Together they will lead a global group of more than 11,500 staff members with turnover in excess of $1.7 billion.
 
"Arup's strategy is quite simply to deliver the best quality work for our clients across all sectors," Hodkinson explains. "I believe that we have the right people with the right skills to add even more value in vitally important areas such as resilient city development, transport, water and low-carbon energy, so that's where we aim to refine our focus."
 
Hodkinson has spent his professional career at Arup and is a passionate believer in Arup's mission to 'shape a better world'. He brings more than 40 years' experience in large-scale projects to the new role, including several in the US and Canada: JetBlue, British Airways and Delta Airlines terminals at JFK International in New York; New Terminal Development for Toronto's Pearson International Airport; Fulton Street Transit Center, and Second Avenue Subway in New York.
 
Gregory Hodkinson joined Arup in 1972, having been inspired by the firm's work on the Sydney Opera House. He worked on major urban development and transport projects in Australia and the UK, before leading the firm's expansion in the US in 1988 as a Founding Principal of the New York office. Hodkinson became Chairman of the Americas Region in 2004, a role now held by Mahadev Raman. In 2011, Hodkinson moved to Milan to lead the firm's European business and was subsequently appointed Chairman of the global Group by the Arup Trustees as of April 1, 2014.
 

Tags

Related Stories

Giants 400 | Aug 30, 2023

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

Building Team | Aug 28, 2023

Navigating challenges in construction administration

Vessel Architecture's Rebekah Schranck, AIA, shares how the demanding task of construction administration can be challenging, but crucial.

Laboratories | Aug 24, 2023

Net-zero carbon science center breaks ground in Canada

Designed by Diamond Schmitt, the new Atlantic Science Enterprise Centre (ASEC) will provide federal scientists and partners with state-of-the-art space and equipment to collaborate on research opportunities.

Multifamily Housing | Aug 24, 2023

A multifamily design for multigenerational living

KTGY’s Family Flat concept showcases the benefits of multigenerational living through a multifamily design lens.

Multifamily Housing | Aug 23, 2023

Constructing multifamily housing buildings to Passive House standards can be done at cost parity

All-electric multi-family Passive House projects can be built at the same cost or close to the same cost as conventionally designed buildings, according to a report by the Passive House Network. The report included a survey of 45 multi-family Passive House buildings in New York and Massachusetts in recent years.

Regulations | Aug 23, 2023

Gas industry drops legal challenge to heat pump requirement in Washington building code

Gas and construction industry groups recently moved to dismiss a lawsuit they had filed to block new Washington state building codes that require heat pumps in new residential and commercial construction. The lawsuit contended that the codes harm the industry groups’ business, interfere with consumer energy choice, and don’t comply with federal law. 

Government Buildings | Aug 23, 2023

White House wants to ‘aggressively’ get federal workers back to the office

The Biden administration wants to “aggressively” get federal workers back in the office by September or October. “We are returning to in-person work because it is critical to the well-being of our teams and will enable us to deliver better results for the American people,” according to an email by White House Chief of Staff Jeff Zients. The administration will not eliminate remote work entirely, though.

Building Owners | Aug 23, 2023

Charles Pankow Foundation releases free project delivery selection tool for building owners, developers, and project teams

Building owners and project teams can use the new Building Owner Assessment Tool (BOAT) to better understand how an owner's decision-making profile impacts outcomes for different project delivery methods.

Transportation & Parking Facilities | Aug 23, 2023

California parking garage features wind-activated moving mural

A massive, colorful, moving mural creatively conceals a newly opened parking garage for a global technology company in Mountain View, Calif.

Giants 400 | Aug 22, 2023

Top 115 Architecture Engineering Firms for 2023

Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021