flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA Recognizes the Best in Public Architecture

GSA Recognizes the Best in Public Architecture

Design Award Winners Showcase Federal Government's Commitment to Sustainable and Innovative Design


January 21, 2011
United States Land Port of Entry, Warroad, Minn.
United States Land Port of Entry, Warroad, Minn.

WASHINGTON, Jan. 20, 2011 -- Today, the U.S. General Services Administration recognized the best in public architecture and civilian federal workplaces at the 2010 GSA Design Awards in Washington, D.C. This year's 11 award winners showcase the federal government's commitment to cutting-edge architectural design and its focus on sustainability. 

"GSA is working hard to change the look and feel of federal buildings," said GSA Administrator Martha Johnson. "We are making the investments now to save energy and taxpayer money in the future. The winning projects mark not just innovation in design, but also, rapid progress toward our nation's sustainability goals."

The biennial GSA Design Awards celebrate the best federal civilian workplaces, including land ports of entry, federal courthouses, and office buildings.  The winners are selected by a jury of private sector design and building professionals. 

"Through collaboration with some of the best architects and engineers in the country, we are creating a welcoming and sustainable federal presence in communities across the country," said GSA Commissioner of Public Buildings Robert A. Peck. "GSA's Design Awards celebrate the energy and creativity of everyone who works tirelessly to deliver the best in public architecture."

The 2010 GSA Design Award winners are:

  • United States Land Port of Entry, Warroad, Minn. – ARCHITECTURE AND INTERIOR DESIGN HONORS; CONSTRUCTION, ENGINEERING, LANDSCAPE ARCHITECTURE CITATIONS
  • United States Land Port of Entry, Massena, N.Y. – ARCHITECTURE AND ART CITATIONS
  • United States Land Port of Entry, Calais, Maine – ARCHITECTURE CITATION
  • Historic District of Columbia Courthouse, Washington, D.C. – PRESERVATION CITATION
  • United States Courthouse, Cedar Rapids, Iowa – PRESERVATION CITATION
  • Federal Parking Garage, San Juan, Puerto Rico – ON-THE-BOARDS ARCHITECTURE CITATION
  • United States Land Port of Entry, Van Buren, Maine – ON-THE-BOARDS ARCHITECTURE CITATION
  • Mariposa Land Port of Entry, Nogales, Ariz. – ON-THE-BOARDS COMMUNICATIONS CITATION
  • Peter W. Rodino Federal Building modernization, Newark, N.J. – ON-THE-BOARDS ENGINEERING CITATION
  • Dr. A.H. McCoy Federal Building modernization, Jackson, Miss. – ON-THE-BOARDS URBANISM
  • United States Courthouse, San Diego, Calif. – ON-THE-BOARDS URBANISM

For more information about the GSA Design Excellence Awards, visit gsa.gov/designawards.

As the federal government's workplace solutions provider, the U.S. General Services Administration works to foster an effective, sustainable and transparent government for the American people. GSA's expertise in government workplace solutions include:

    * Effective management of government assets including more than 9,600 government-owned or leased buildings and 210,000 vehicles in the federal fleet, and preservation of historic federal properties;

    * Leveraging the government's buying power through responsible acquisition of products and services making up more than 11 percent of the government's total procurement dollars;

    * Providing innovative technology solutions to enhance government efficiency and increase citizen engagement; and,

    * Promoting responsible use of federal resources through development of governmentwide policies ranging from federal travel to property and management practices.

Related Stories

Adaptive Reuse | Oct 22, 2024

Adaptive reuse project transforms 1840s-era mill building into rental housing

A recently opened multifamily property in Lawrence, Mass., is an adaptive reuse of an 1840s-era mill building. Stone Mill Lofts is one of the first all-electric mixed-income multifamily properties in Massachusetts. The all-electric building meets ambitious modern energy codes and stringent National Park Service historic preservation guidelines.

MFPRO+ News | Oct 22, 2024

Project financing tempers robust demand for multifamily housing

AEC Giants with multifamily practices report that the sector has been struggling over the past year, despite the high demand for housing, especially affordable products.

Performing Arts Centers | Oct 21, 2024

The New Jersey Performing Arts Center breaks ground on $336 million redevelopment of its 12-acre campus

In Newark, N.J., the New Jersey Performing Arts Center (NJPAC) has broken grown on the three-year, $336 million redevelopment of its 12-acre campus. The project will provide downtown Newark 350 mixed-income residential units, along with shops, restaurants, outdoor gathering spaces, and an education and community center with professional rehearsal spaces.

Office Buildings | Oct 21, 2024

3 surprises impacting the return to the office

This blog series exploring Gensler's Workplace Survey shows the top three surprises uncovered in the return to the office.

Healthcare Facilities | Oct 18, 2024

7 design lessons for future-proofing academic medical centers

HOK’s Paul Strohm and Scott Rawlings and Indiana University Health’s Jim Mladucky share strategies for planning and designing academic medical centers that remain impactful for generations to come.

Sports and Recreational Facilities | Oct 17, 2024

In the NIL era, colleges and universities are stepping up their sports facilities game

NIL policies have raised expectations among student-athletes about the quality of sports training and performing facilities, in ways that present new opportunities for AEC firms.

Codes and Standards | Oct 17, 2024

Austin, Texas, adopts AI-driven building permit software

After a successful pilot program, Austin has adopted AI-driven building permit software to speed up the building permitting process.

Resiliency | Oct 17, 2024

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

Seismic Design | Oct 17, 2024

Calif. governor signs limited extension to hospital seismic retrofit mandate

Some California hospitals will have three additional years to comply with the state’s seismic retrofit mandate, after Gov. Gavin Newsom signed a bill extending the 2030 deadline.

MFPRO+ News | Oct 16, 2024

One-third of young adults say hurricanes like Helene and Milton will impact where they choose to live

Nearly one-third of U.S. residents between 18 and 34 years old say they are reconsidering where they want to move after seeing the damage wrought by Hurricane Helene, according to a Redfin report. About 15% of those over age 35 echoed their younger cohort’s sentiment.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021