WASHINGTON, Jan. 20, 2011 -- Today, the U.S. General Services Administration recognized the best in public architecture and civilian federal workplaces at the 2010 GSA Design Awards in Washington, D.C. This year's 11 award winners showcase the federal government's commitment to cutting-edge architectural design and its focus on sustainability.
"GSA is working hard to change the look and feel of federal buildings," said GSA Administrator Martha Johnson. "We are making the investments now to save energy and taxpayer money in the future. The winning projects mark not just innovation in design, but also, rapid progress toward our nation's sustainability goals."
The biennial GSA Design Awards celebrate the best federal civilian workplaces, including land ports of entry, federal courthouses, and office buildings. The winners are selected by a jury of private sector design and building professionals.
"Through collaboration with some of the best architects and engineers in the country, we are creating a welcoming and sustainable federal presence in communities across the country," said GSA Commissioner of Public Buildings Robert A. Peck. "GSA's Design Awards celebrate the energy and creativity of everyone who works tirelessly to deliver the best in public architecture."
The 2010 GSA Design Award winners are:
- United States Land Port of Entry, Warroad, Minn. – ARCHITECTURE AND INTERIOR DESIGN HONORS; CONSTRUCTION, ENGINEERING, LANDSCAPE ARCHITECTURE CITATIONS
- United States Land Port of Entry, Massena, N.Y. – ARCHITECTURE AND ART CITATIONS
- United States Land Port of Entry, Calais, Maine – ARCHITECTURE CITATION
- Historic District of Columbia Courthouse, Washington, D.C. – PRESERVATION CITATION
- United States Courthouse, Cedar Rapids, Iowa – PRESERVATION CITATION
- Federal Parking Garage, San Juan, Puerto Rico – ON-THE-BOARDS ARCHITECTURE CITATION
- United States Land Port of Entry, Van Buren, Maine – ON-THE-BOARDS ARCHITECTURE CITATION
- Mariposa Land Port of Entry, Nogales, Ariz. – ON-THE-BOARDS COMMUNICATIONS CITATION
- Peter W. Rodino Federal Building modernization, Newark, N.J. – ON-THE-BOARDS ENGINEERING CITATION
- Dr. A.H. McCoy Federal Building modernization, Jackson, Miss. – ON-THE-BOARDS URBANISM
- United States Courthouse, San Diego, Calif. – ON-THE-BOARDS URBANISM
For more information about the GSA Design Excellence Awards, visit gsa.gov/designawards.
As the federal government's workplace solutions provider, the U.S. General Services Administration works to foster an effective, sustainable and transparent government for the American people. GSA's expertise in government workplace solutions include:
* Effective management of government assets including more than 9,600 government-owned or leased buildings and 210,000 vehicles in the federal fleet, and preservation of historic federal properties;
* Leveraging the government's buying power through responsible acquisition of products and services making up more than 11 percent of the government's total procurement dollars;
* Providing innovative technology solutions to enhance government efficiency and increase citizen engagement; and,
* Promoting responsible use of federal resources through development of governmentwide policies ranging from federal travel to property and management practices.
Related Stories
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.