flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA Recognizes the Best in Public Architecture

GSA Recognizes the Best in Public Architecture

Design Award Winners Showcase Federal Government's Commitment to Sustainable and Innovative Design


January 21, 2011
United States Land Port of Entry, Warroad, Minn.
United States Land Port of Entry, Warroad, Minn.

WASHINGTON, Jan. 20, 2011 -- Today, the U.S. General Services Administration recognized the best in public architecture and civilian federal workplaces at the 2010 GSA Design Awards in Washington, D.C. This year's 11 award winners showcase the federal government's commitment to cutting-edge architectural design and its focus on sustainability. 

"GSA is working hard to change the look and feel of federal buildings," said GSA Administrator Martha Johnson. "We are making the investments now to save energy and taxpayer money in the future. The winning projects mark not just innovation in design, but also, rapid progress toward our nation's sustainability goals."

The biennial GSA Design Awards celebrate the best federal civilian workplaces, including land ports of entry, federal courthouses, and office buildings.  The winners are selected by a jury of private sector design and building professionals. 

"Through collaboration with some of the best architects and engineers in the country, we are creating a welcoming and sustainable federal presence in communities across the country," said GSA Commissioner of Public Buildings Robert A. Peck. "GSA's Design Awards celebrate the energy and creativity of everyone who works tirelessly to deliver the best in public architecture."

The 2010 GSA Design Award winners are:

  • United States Land Port of Entry, Warroad, Minn. – ARCHITECTURE AND INTERIOR DESIGN HONORS; CONSTRUCTION, ENGINEERING, LANDSCAPE ARCHITECTURE CITATIONS
  • United States Land Port of Entry, Massena, N.Y. – ARCHITECTURE AND ART CITATIONS
  • United States Land Port of Entry, Calais, Maine – ARCHITECTURE CITATION
  • Historic District of Columbia Courthouse, Washington, D.C. – PRESERVATION CITATION
  • United States Courthouse, Cedar Rapids, Iowa – PRESERVATION CITATION
  • Federal Parking Garage, San Juan, Puerto Rico – ON-THE-BOARDS ARCHITECTURE CITATION
  • United States Land Port of Entry, Van Buren, Maine – ON-THE-BOARDS ARCHITECTURE CITATION
  • Mariposa Land Port of Entry, Nogales, Ariz. – ON-THE-BOARDS COMMUNICATIONS CITATION
  • Peter W. Rodino Federal Building modernization, Newark, N.J. – ON-THE-BOARDS ENGINEERING CITATION
  • Dr. A.H. McCoy Federal Building modernization, Jackson, Miss. – ON-THE-BOARDS URBANISM
  • United States Courthouse, San Diego, Calif. – ON-THE-BOARDS URBANISM

For more information about the GSA Design Excellence Awards, visit gsa.gov/designawards.

As the federal government's workplace solutions provider, the U.S. General Services Administration works to foster an effective, sustainable and transparent government for the American people. GSA's expertise in government workplace solutions include:

    * Effective management of government assets including more than 9,600 government-owned or leased buildings and 210,000 vehicles in the federal fleet, and preservation of historic federal properties;

    * Leveraging the government's buying power through responsible acquisition of products and services making up more than 11 percent of the government's total procurement dollars;

    * Providing innovative technology solutions to enhance government efficiency and increase citizen engagement; and,

    * Promoting responsible use of federal resources through development of governmentwide policies ranging from federal travel to property and management practices.

Related Stories

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021