flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA wants to trade D.C. office building for construction and development services

GSA wants to trade D.C. office building for construction and development services

RFQ seeks services in exchange for regional office in D.C.


By GSA | April 30, 2014
The GSA Regional Office and Cotton Annex in Southwest Washington, D.C., is being
The GSA Regional Office and Cotton Annex in Southwest Washington, D.C., is being used as trade bait. Photo: GSA

The U.S. General Services Administration has issued a Request for Qualifications seeking developers who can provide construction and development services in exchange for the GSA Regional Office Building and Cotton Annex, both located in Southwest Washington, D.C. 

These services would be used to help GSA consolidate about 1,500 regional staff from the Regional Office Building into the GSA headquarters located at 1800 F St., NW and renovate up to three historic buildings at St. Elizabeths campus in Southeast Washington.

This action will allow GSA to leverage the value of outdated and underperforming properties to provide the government with efficient modern office space to better serve our current needs.  

Last year, the agency issued a Request for Information (RFI), soliciting innovative ideas from the development community to help the agency gather possible development scenarios that provide cost savings, space, efficiency, and modernization solutions for federal agencies located at Federal Triangle South.

“The Federal Triangle South project is an opportunity to reexamine how the federal government uses these buildings and reassess how this space fits into the surrounding community,” said GSA Administrator Dan Tangherlini. “This action will facilitate the city’s efforts to transform this precinct that is dominated by federal office buildings, into a mixed-use neighborhood that will both provide for a modern workplace for federal employees and create a vibrant, diverse, and special community of its own.”

GSA’s action supports the vision for Federal Triangle South identified by the National Capital Planning Commission’s Southwest EcoDistrict -- a sustainable community stretching from the National Mall to the Southwest Waterfront. 

The vision includes a number of federal buildings and seeks to reduce costs by overhauling these outdated and underperforming assets, developing state-of-the-art green facilities, and encouraging mixed-use and improved infrastructure. The deadline for RFQ questions is April 17, 2014. Responses are due by May 22, 2014. The RFQ is now posted on Fed Biz Opps.

Reducing the Federal Footprint & Increasing Efficiency

The Obama Administration has set aggressive goals for using federal real estate assets more efficiently, and GSA has increased its efforts to help federal agencies identify underutilized properties and move them into the disposal process.

The Federal Triangle South RFQ is part of GSA’s ongoing effort to get underperforming federal facilities, such as the Cotton Annex, off of the government's books, while creating the greatest possible value for taxpayers. It would also allow GSA to consolidate its employees in the National Capitol Region into one building, the 1800 F St. NW headquarters. This would not only cut costs and reduce energy consumption, but also maximize workplace efficiencies by bringing employees into GSA’s Total Workplace program.

(http://www.gsa.gov/portal/content/189811)

Related Stories

Codes and Standards | Sep 3, 2020

Turner Construction takes strong stand against racism

Shuts down work sites for anti-bias training.

Codes and Standards | Sep 2, 2020

California releases guide for state water policy

Water Resilience Portfolio is roadmap for meeting water needs as climate changes.

Codes and Standards | Aug 25, 2020

Platform will allow researchers to test energy system integration at scale

The U.S. Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL) recently launched the Advanced Research on Integrated Energy Systems (ARIES) platform.

Codes and Standards | Aug 20, 2020

Wariness of elevators may stymie office reopening

Workers could balk at returning to high-rises.

Codes and Standards | Aug 18, 2020

Florida becomes the third state to adopt concrete repair code

Sets minimum requirements for design, construction, repair of concrete structural elements in buildings.

Codes and Standards | Aug 17, 2020

ASCE seeks comments on seismic standard

Pertains to design criteria for nuclear facilities.

Codes and Standards | Aug 13, 2020

COVID-19 reboot guide offers strategies for reopening K-12 schools

Looks at space considerations for reopening at different scales.

Codes and Standards | Aug 12, 2020

Document provides guidance for mass timber construction

Overview of Intl. Building Code requirements included.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021