The JAGG Group, a consulting and publishing company dedicated to the architecture, engineering, environmental and construction industries, ranks the apartment market as the hottest for AEC firms working in the United States in 2013.
The company’s 270-page report – The 2013 Guide to the U.S. AEC Markets – ranks 40 separate market sectors served by AEC firms within seven broader categories: residential, commercial, institutional, transportation, water/wastewater, environmental and power.
The full list is available on the firm’s blog (http://www.aecinsight.com).
“Ranking the markets according to a variety of factors, including size, anticipated growth and intangibles unique to the individual market gives some guidance to firms planning their marketing and business development approach in 2013,” says report author Jerry Guerra. “The intention is to show the relative strength various markets served by AEC firms in the United States. It is essentially a summary of the data and information presented throughout the rest of the report, which is where the real meat of these rankings lies.”
The report predicts that the multifamily-for-rent market, which enjoyed solid growth and high activity in 2012, will repeat its strong performance in 2013. The apartment market is followed in the rankings by natural gas, senior housing, transmission/ distribution and health care as the five markets anticipated to be the healthiest in 2013.
On the opposite end of the ranking for the New Year are high-speed rail, nuclear power and brownfields.
The report ranks the markets according to a weighted scale that takes into account the market’s size, short-term growth projection (2013), long-term growth projection (annualized five-year estimate) and a variety of intangible factors.
The intangible category – worth 20% of the total – is included to adjust for factors outside of size and anticipated growth. For example, single-family housing is a massive market expected to have a high growth rate in both the short- and long-term. However, because the market is recovering from such a low point, competition is high (including many small firms still starving for work) and opportunities for traditional architecture and engineering firms are limited, the “intangible” category drags the single-family housing market closer to the middle of the pack (12th overall).
To support the market sector rankings and provide more insight into their outlook for 2013, the book includes more than 150 pages of analysis. The annual report – the sixth authored by the 10-year-old JAGG Group – also includes top industry trends, an analysis of the 2012 Election results, an overview of the industry and U.S. economy, and a glimpse of international market opportunities for 2013. +
Related Stories
Museums | Aug 11, 2010
Design guidelines for museums, archives, and art storage facilities
This column diagnoses the three most common moisture challenges with museums, archives, and art storage facilities and provides design guidance on how to avoid them.
| Aug 11, 2010
Broadway-style theater headed to Kentucky
One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.
| Aug 11, 2010
Citizenship building in Texas targets LEED Silver
The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.
| Aug 11, 2010
Carpenters' union helping build its own headquarters
The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...
| Aug 11, 2010
Utah research facility reflects Native American architecture
A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.
| Aug 11, 2010
San Bernardino health center doubles in size
Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.
| Aug 11, 2010
Goettsch Partners wins design competition for Soochow Securities HQ in China
Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.
| Aug 11, 2010
New hospital expands Idaho healthcare options
Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...
| Aug 11, 2010
Colonnade fixes setback problem in Brooklyn condo project
The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.