Ellicott City, Maryland suffered its second damaging “1,000-year” flood in two years last month.
The city is in a vulnerable location at the foot of a hill where river branches meet the Patapsco River. Another factor, a lot of impermeable concrete, exacerbated the flood.
Ellicott City has thrived in recent years with robust development. About one-third of the watershed that feeds into the historic community is now covered by roads, rooftops, sidewalks, and other hard surfaces.
Since the first major flood in 2016, the county has designed and engineered more stormwater retention facilities, but these projects will take time to implement. Across most of the U.S, impermeable surfaces make up just 1% percent of the land. In many cities, though, hardscapes account for 40% or more of the land area, leaving them vulnerable to floods.
Related Stories
Codes and Standards | Apr 28, 2017
New York man alleged to have posed as licensed architect faces possible prison time
He is charged with defrauding construction companies, business owners, and local governments.
Codes and Standards | Apr 27, 2017
Extensive list of plug load efficiency utility incentives available for free download
The Dept. of Energy resource is a state-by-state compilation with hundreds of listings.
Codes and Standards | Apr 26, 2017
Chicago commits to 100% renewable power for all city buildings
In doing so, it becomes largest U.S. city to make such a pledge.
Codes and Standards | Apr 25, 2017
Concerns over increased construction costs following Trump executive orders
‘Buy American’ requirement and revised H-1B visa restrictions could raise prices on supplies, labor.
Codes and Standards | Apr 24, 2017
‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction
Study finds significant problems with how city manages capital projects.
Codes and Standards | Apr 20, 2017
California lawmakers have had little success in attracting sports stadiums
Only one of several attempts has had an impact in recent years.
Codes and Standards | Apr 19, 2017
Dept. of Energy releases updated versions of EnergyPlus and OpenStudio building energy modeling tools
The updated versions include full support for variable speed DX coils, enhanced plant auto-sizing, new fan model, and support for non-rectangular windows.
Codes and Standards | Apr 18, 2017
K-12 school daylighting initiative created to promote best practices
Eneref Institute creates networking group of school administrators for ideas to overcome market obstacles.
Codes and Standards | Apr 17, 2017
OSHA delays enforcing crystalline silica standard in construction industry
Enforcement will begin Sept. 23, three months later than planned.
Codes and Standards | Apr 13, 2017
Former OSHA official publishes safety citations on his own
Under Trump orders, agency had stopped issuing ‘shaming’ press releases on major fines and safety violations.