flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hardscape from development makes ‘1,000-year’ flood in Maryland worse

Codes and Standards

Hardscape from development makes ‘1,000-year’ flood in Maryland worse

Impermeable concrete made it easier for water to overwhelm drainage system.


By Peter Fabris, Contributing Editor | June 14, 2018

Ellicott City, Maryland suffered its second damaging “1,000-year” flood in two years last month.

The city is in a vulnerable location at the foot of a hill where river branches meet the Patapsco River. Another factor, a lot of impermeable concrete, exacerbated the flood.

Ellicott City has thrived in recent years with robust development. About one-third of the watershed that feeds into the historic community is now covered by roads, rooftops, sidewalks, and other hard surfaces.

Since the first major flood in 2016, the county has designed and engineered more stormwater retention facilities, but these projects will take time to implement. Across most of the U.S, impermeable surfaces make up just 1% percent of the land. In many cities, though, hardscapes account for 40% or more of the land area, leaving them vulnerable to floods.

Related Stories

| Aug 21, 2014

American Iron and Steel Institute revises 14 test standards

The American Iron and Steel Institute (AISI) published 14 revised test standards in its S900-series.

| Aug 14, 2014

Mississippi county rejects adoption of state building code

The county board of supervisors voted unanimously to opt out of the state building code.

| Aug 14, 2014

Boards at odds over North Carolina county’s CM-at-Risk policy

Some local small contractors are not pleased with the school board’s CM-at-Risk policy that was instituted in 2007. The county’s board of commissioners has offered a sympathetic ear to their complaints

| Aug 14, 2014

2014 National Electrical Code now effective in 12 states; 11 more to come online by January

The National Fire Protection Association (NFPA) says that the 2014 edition of the National Electrical Code(NEC) is now effective in 12 states: Alabama, Colorado, Idaho, Maine, Massachusetts, Minnesota, New Mexico, Rhode Island, South Dakota, Vermont, Washington and Wyoming.

| Aug 14, 2014

CDC report highlights need for heat acclimatization to prevent worker deaths

CDC supports OSHA’s analysis suggesting that the primary risk factor for heat fatalities is the lack of acclimatization programs.

| Aug 8, 2014

California revives study of earthquake faults

California reinstituted an ambitious plan to study dangerous earthquake faults and create zoning maps that could restrict development.

| Aug 6, 2014

Loudoun County, Virginia may dump green building requirements

Loudoun County, Va., supervisors may do away with a county policy that requires LEED Silver certification on new county buildings.

| Aug 6, 2014

$300 million mixed-use project in Chicago’s medical district wins key approval

The Illinois Medical District Commission approved a 1.16 million-sf, $300 million mixed-use project in Chicago’s Illinois Medical District.

| Aug 4, 2014

Facebook’s prefab data center concept aims to slash construction time in half

Less than a year after opening its ultra-green, hydropowered data center facility in Luleå, Sweden, Facebook is back at it in Mother Svea with yet another novel approach to data center design.

| Jul 31, 2014

LEED Dynamic Plaque gives owners and tenants ability to monitor building performance

The LEED Dynamic Plaque could aid certified buildings in maintaining performance with up-to-date information about water and energy use, waste reduction efforts, occupant experience, and other green performance categories.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021