flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Harley Ellis Devereaux merges with Deems Lewis McKinley

Architects

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.


By John Caulfield, Senior Editor | January 19, 2017

An aerial view of the Susan B. Anthony School in Daly City, Calif., one of the signature projects of Deems Lewis McKinley, which specializes in K-12 design. Image: DLM

Southfield, Mich.-based architectural firm Harley Ellis Devereaux (HED) is joining forces with Deems Lewis McKinley (DLM), a 57-year-old architecture and engineering services firm headquartered in San Franicisco.

The merger, whose terms were not disclosed, is expected to strengthen HED’s presence in the K-12 and Community Education markets, where DLM has established itself as a recognized leader. (Its tagline is “Improving Education through Design,” and 95% of its clients are educational institutions.)

Among its featured projects in that sector is the Bay Farm Elementary School in the Alameda (Calif.) Unified School District, whose eight-acre campus is surrounded on three sides by single-family residences, and adjoined by a five-acre city park. DLM also designed the new 44,000-sf Susan B. Anthony School in Daly City, Calif., which resembles a modern version of a red brick schoolhouse.

This merger expands HED’s presence in California’s Bay Area and Sacramento, DLM’s two primary markets. Prior to this agreement, HED had been managing its accounts and projects in Northern California mostly out of its office in Los Angeles, according to a company spokesperson. Next month, DLM’s staff in San Francisco will relocate to HED’s San Francisco office, which is currently being enlarged. DLM’s employees working out of its Sacramento office will stay there.

“We are looking forward to merging the talents of our two teams and are excited to be part of a very talented studio with deep resources,” says Wallace B. (Wally) Gordon, AIA, LEED AP, President and Chief Executive Officer of DLM, who is staying stay on with HED along with DLM’s principals and senior associates. The one person working in DLM’s office in San Diego—where the firm was founded—will now work from HED’s 20-person office in that city.

Prior to this agreement, HED had 380 employees working from offices in Chicago, Detroit, L.A., San Diego, and San Francisco.

Related Stories

Senior Living Design | Apr 24, 2024

Nation's largest Passive House senior living facility completed in Portland, Ore.

Construction of Parkview, a high-rise expansion of a Continuing Care Retirement Community (CCRC) in Portland, Ore., completed recently. The senior living facility is touted as the largest Passive House structure on the West Coast, and the largest Passive House senior living building in the country.

Hotel Facilities | Apr 24, 2024

The U.S. hotel construction market sees record highs in the first quarter of 2024

As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.

Architects | Apr 24, 2024

Shepley Bulfinch appoints new Board of Director: Evelyn Lee, FAIA

Shepley Bulfinch, a national architecture firm announced the appointment of new Board of Director member Evelyn Lee, FAIA as an outside director. With this new appointment, Lucia Quinn has stepped down from the firm’s Board, after serving many years as an outside board advisor and then as an outside director. 

ProConnect Events | Apr 23, 2024

5 more ProConnect events scheduled for 2024, including all-new 'AEC Giants'

SGC Horizon present 7 ProConnect events in 2024.

75 Top Building Products | Apr 22, 2024

Enter today! BD+C's 75 Top Building Products for 2024

BD+C editors are now accepting submissions for the annual 75 Top Building Products awards. The winners will be featured in the November/December 2024 issue of Building Design+Construction. 

Laboratories | Apr 22, 2024

Why lab designers should aim to ‘speak the language’ of scientists

Learning more about the scientific work being done in the lab gives designers of those spaces an edge, according to Adrian Walters, AIA, LEED AP BD+C, Principal and Director of SMMA's Science & Technology team.

Resiliency | Apr 22, 2024

Controversy erupts in Florida over how homes are being rebuilt after Hurricane Ian

The Federal Emergency Management Agency recently sent a letter to officials in Lee County, Florida alleging that hundreds of homes were rebuilt in violation of the agency’s rules following Hurricane Ian. The letter provoked a sharp backlash as homeowners struggle to rebuild following the devastating 2022 storm that destroyed a large swath of the county.

Mass Timber | Apr 22, 2024

British Columbia changing building code to allow mass timber structures of up to 18 stories

The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit. 

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021