flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Harley Ellis Devereaux merges with Deems Lewis McKinley

Architects

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.


By John Caulfield, Senior Editor | January 19, 2017

An aerial view of the Susan B. Anthony School in Daly City, Calif., one of the signature projects of Deems Lewis McKinley, which specializes in K-12 design. Image: DLM

Southfield, Mich.-based architectural firm Harley Ellis Devereaux (HED) is joining forces with Deems Lewis McKinley (DLM), a 57-year-old architecture and engineering services firm headquartered in San Franicisco.

The merger, whose terms were not disclosed, is expected to strengthen HED’s presence in the K-12 and Community Education markets, where DLM has established itself as a recognized leader. (Its tagline is “Improving Education through Design,” and 95% of its clients are educational institutions.)

Among its featured projects in that sector is the Bay Farm Elementary School in the Alameda (Calif.) Unified School District, whose eight-acre campus is surrounded on three sides by single-family residences, and adjoined by a five-acre city park. DLM also designed the new 44,000-sf Susan B. Anthony School in Daly City, Calif., which resembles a modern version of a red brick schoolhouse.

This merger expands HED’s presence in California’s Bay Area and Sacramento, DLM’s two primary markets. Prior to this agreement, HED had been managing its accounts and projects in Northern California mostly out of its office in Los Angeles, according to a company spokesperson. Next month, DLM’s staff in San Francisco will relocate to HED’s San Francisco office, which is currently being enlarged. DLM’s employees working out of its Sacramento office will stay there.

“We are looking forward to merging the talents of our two teams and are excited to be part of a very talented studio with deep resources,” says Wallace B. (Wally) Gordon, AIA, LEED AP, President and Chief Executive Officer of DLM, who is staying stay on with HED along with DLM’s principals and senior associates. The one person working in DLM’s office in San Diego—where the firm was founded—will now work from HED’s 20-person office in that city.

Prior to this agreement, HED had 380 employees working from offices in Chicago, Detroit, L.A., San Diego, and San Francisco.

Related Stories

Industrial Facilities | Nov 16, 2022

Industrial building sector construction, while healthy, might also be flattening

For all the hoopla about the ecommerce boom and “last mile” order fulfillment driving demand for more warehouse and manufacturing space, construction of industrial buildings actually declined over the past five years, albeit marginally by 2.1% to $27.3 billion in 2022, according to estimates by IBIS World. Still, construction in this sector remains buzzy.

Wood | Nov 16, 2022

5 steps to using mass timber in multifamily housing

A design-assist approach can provide the most effective delivery method for multifamily housing projects using mass timber as the primary building element.

Giants 400 | Nov 14, 2022

Top 55 Airport Terminal Architecture + AE Firms for 2022

Gensler, PGAL, Corgan, and HOK top the ranking of the nation's largest airport terminal architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report. 

Giants 400 | Nov 14, 2022

4 emerging trends from BD+C's 2022 Giants 400 Report

Regenerative design, cognitive health, and jobsite robotics highlight the top trends from the 519 design and construction firms that participated in BD+C's 2022 Giants 400 Report.

Green | Nov 13, 2022

NREL report: Using photovoltaic modules with longer lifetimes is a better option than recycling

A new report from the U.S. National Renewable Energy Laboratory (NREL) says PV module lifetime extensions should be prioritized over closed-loop recycling to reduce demand for new materials.

Green | Nov 13, 2022

Global building emissions reached record levels in 2021

Carbon-dioxide emissions from building construction and operations hit an all-time high in 2021, according to the most recent data compiled by the Global Alliance for Buildings and Construction.

University Buildings | Nov 13, 2022

University of Washington opens mass timber business school building

Founders Hall at the University of Washington Foster School of Business, the first mass timber building at Seattle campus of Univ. of Washington, was recently completed. The 84,800-sf building creates a new hub for community, entrepreneurship, and innovation, according the project’s design architect LMN Architects.

Architects | Nov 10, 2022

What’s new at 173 architecture firms for 2022

More than 295 U.S. architecture and architecture-engineering (AE) firms participated in BD+C's 2022 Giants 400 survey. As part of the Giants survey process, participating firms are asked to describe their most impactful firm innovations and noteworthy company moves in the past 12 months. Here is a collection of the most compelling business and project innovations and business moves from the 2022 Architecture Giants.

Giants 400 | Nov 9, 2022

Top 30 Data Center Architecture + AE Firms for 2022

HDR, Corgan, Sheehan Nagle Hartray Architects, and Gensler top the ranking of the nation's largest data center architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report. 

Giants 400 | Nov 8, 2022

Top 110 Sports Facility Architecture and AE Firms for 2022

Populous, HOK, Gensler, and Perkins and Will top the ranking of the nation's largest sports facility architecture and architecture/engineering (AE) firms for 2022, as reported in Building Design+Construction's 2022 Giants 400 Report. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021