flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Harvard’s District Energy Facility showcases a new infrastructure typology

University Buildings

Harvard’s District Energy Facility showcases a new infrastructure typology

The building is currently under construction.


By David Malone, Associate Editor | March 14, 2018
The DEF at night

Rendering courtesy of Leers Weinzapfel Associates

The 58,000-sf Harvard University Allston Campus District Energy Facility (DEF) will provide electricity, hot water, and chilled water to the Allston campus. The building represents a new infrastructure typology dubbed the cogeneration plant.

Designed by Leers Weinzapfel Associates, the DEF uses a compact cubic form with rounded corners that allows for maximum flexibility of future development and is a visible demonstration of cost-effective sustainability in building. The facility is wrapped in metal fins that form a screen around it, with “petal-like” elements set at varying degrees of openness to reveal or conceal the various equipment areas within.

 

Harvard's DEF as seen from across the riverRendering courtesy of Leers Weinzapfel Associates.

 

The fins are most open at the building’s corner entry and round the thermal energy storage tank. They are most closed on the service sides. The fins are raised above the ground on the public face of the building to reveal the main equipment hall to passersby.

The DEF’s transparent interior allows it to be used as a teaching tool for the university’s new science and engineering campus. People can observe the cogeneration plant’s complicated system of chillers, boilers, piping, pumps and flues, and electrical tools.

 

Rendering of Harvard's DEFRendering courtesy of Leers Weinzapfel Associates.

 

RMF Engineering designed the DEF’s equipment systems, which are efficient, resilient, and adaptable to the campus’s future needs. A chilled water reserve tank provides thermal energy to support efficient equipment use and equipment elevated above flood levels supports resiliency for continuous independent operation of the facility, even in the event of electrical grid failure. 

The project is slated for completion in 2019.

 

Rendering courtesy of Leers Weinzapfel Associates.

Tags

Related Stories

Energy-Efficient Design | Mar 20, 2018

University of Hawaii Maui College on pace to become first U.S. campus to generate 100% renewable energy on-site

The project is part of a partnership with Johnson Controls and Pacific Current that will also allow four UH community college campuses on Oahu to significantly reduce their fossil fuel consumption.

University Buildings | Feb 16, 2018

The University of Washington receives a new Nanoengineering and Sciences Building

The building marks the second phase of a 168,000-sf complex.

University Buildings | Jan 31, 2018

Report: Spending spree on new buildings a risky venture for some U.S. universities

Higher education institutions continue to add new buildings in spite of increased stress on facilities management budgets, according to a new report from Sightlines.

Healthcare Facilities | Jan 29, 2018

The new Virginia Tech Biomedical Research Addition will include research facilities in five thematic areas

The project is a collaboration between Carilion Clinic and Virginia Tech.

University Buildings | Jan 19, 2018

A 360-degree classroom highlights Washington State University’s new academic innovation hub

The circle-in-the-round classroom can accommodate 275 students.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021