flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hawaiian architecture firm chooses FRP trellis system over traditional materials

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 


By By BD+C Staff | March 22, 2012
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an architectural trellis overlooking Waikiki, Hono

Strongwell’s products were used by Plas-Tech Ltd., a Honolulu, Hawaii fabricator, for an architectural trellis overlooking Waikiki, Honolulu, Hawaii. The trellis sits on top of the Waikiki Shopping Plaza located at the center of the city on world-famous Kalakaua Avenue. The retail center is home to over 50 tenants including national brands GUESS and LeSportSac and also a number of local favorites such as Local Motion, Ukulele House, and Higgins Harte International Galleries.

MGA Architecture, Honolulu, Hawaii, specified the design of the trellis to use Strongwell’s EXTREN 2 x 6-½-in. rectangular tubes. Plas-Tech fabricated the trellis components by molding the outrigger beams and assembling and painting. MGA’s design was inspired by the native Hawaiian culture to evoke sensory response and emotional experience while blending in with the overly urban character of modern-day Waikiki. The trellis system was easily installed and both MGA and Plas-Tech are very happy with the finished product. MGA Architecture was so pleased with Strongwell’s FRP structural shapes, they have plans to add five more trellis systems on the neighboring building. They will also use Strongwell components for another future project.

Project Summary: Waikiki Shopping Plaza, Waikiki, Hawaii

BUILDING TEAM
Architect: MGA Architectures
Fabricator: Plas-Tech Ltd.
Product: Strongwell EXTREN 2 x 6-½-in. rectangular tubes

EXTREN is a proprietary combination of fiberglass reinforcements and thermosetting polyester or vinyl ester resin systems. It is produced in more than 100 standard shapes and has a surface veil to protect against glass fibers penetrating the resin surface in service and to increase corrosion and UV resistance. The features of EXTREN include: corrosion resistant, Low Conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

The features of EXTREN include: corrosion resistant, low conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

EXTREN is offered in three series designed for different environments and applications:

  • Series 500 – an all-purpose series utilizing an isophthalic polyester resin system with a UV inhibitor. Series 500 color is Olive Green
  • Series 525 – An all-purpose series utilizing a fire retardant isophthalic polyester resin system with a UV inhibitor. Series 525 color is Slate Gray (plus certain handrail and fixed ladder components in yellow)
  • Series 625 - A premium series both fire retardant and highly corrosion resistant utilizing a vinyl ester resin system with a UV inhibitor. Series 625 color is Beige

For more information, contact Strongwell at 276-645-8000, webmaster@strongwell.com or visit www.strongwell.com. BD+C

Related Stories

Senior Living Design | Apr 24, 2024

Nation's largest Passive House senior living facility completed in Portland, Ore.

Construction of Parkview, a high-rise expansion of a Continuing Care Retirement Community (CCRC) in Portland, Ore., completed recently. The senior living facility is touted as the largest Passive House structure on the West Coast, and the largest Passive House senior living building in the country.

Hotel Facilities | Apr 24, 2024

The U.S. hotel construction market sees record highs in the first quarter of 2024

As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.

Architects | Apr 24, 2024

Shepley Bulfinch appoints new Board of Director: Evelyn Lee, FAIA

Shepley Bulfinch, a national architecture firm announced the appointment of new Board of Director member Evelyn Lee, FAIA as an outside director. With this new appointment, Lucia Quinn has stepped down from the firm’s Board, after serving many years as an outside board advisor and then as an outside director. 

ProConnect Events | Apr 23, 2024

5 more ProConnect events scheduled for 2024, including all-new 'AEC Giants'

SGC Horizon present 7 ProConnect events in 2024.

75 Top Building Products | Apr 22, 2024

Enter today! BD+C's 75 Top Building Products for 2024

BD+C editors are now accepting submissions for the annual 75 Top Building Products awards. The winners will be featured in the November/December 2024 issue of Building Design+Construction. 

Laboratories | Apr 22, 2024

Why lab designers should aim to ‘speak the language’ of scientists

Learning more about the scientific work being done in the lab gives designers of those spaces an edge, according to Adrian Walters, AIA, LEED AP BD+C, Principal and Director of SMMA's Science & Technology team.

Resiliency | Apr 22, 2024

Controversy erupts in Florida over how homes are being rebuilt after Hurricane Ian

The Federal Emergency Management Agency recently sent a letter to officials in Lee County, Florida alleging that hundreds of homes were rebuilt in violation of the agency’s rules following Hurricane Ian. The letter provoked a sharp backlash as homeowners struggle to rebuild following the devastating 2022 storm that destroyed a large swath of the county.

Mass Timber | Apr 22, 2024

British Columbia changing building code to allow mass timber structures of up to 18 stories

The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit. 

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021