flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Hawaiian architecture firm chooses FRP trellis system over traditional materials

Hawaiian architecture firm chooses FRP trellis system over traditional materials

MGA Architecture plans to add five more trellis systems on the neighboring building. 


By By BD+C Staff | March 22, 2012
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an
Strongwells products were used by Plas-Tech Ltd., a Hawaiian fabricator, for an architectural trellis overlooking Waikiki, Hono

Strongwell’s products were used by Plas-Tech Ltd., a Honolulu, Hawaii fabricator, for an architectural trellis overlooking Waikiki, Honolulu, Hawaii. The trellis sits on top of the Waikiki Shopping Plaza located at the center of the city on world-famous Kalakaua Avenue. The retail center is home to over 50 tenants including national brands GUESS and LeSportSac and also a number of local favorites such as Local Motion, Ukulele House, and Higgins Harte International Galleries.

MGA Architecture, Honolulu, Hawaii, specified the design of the trellis to use Strongwell’s EXTREN 2 x 6-½-in. rectangular tubes. Plas-Tech fabricated the trellis components by molding the outrigger beams and assembling and painting. MGA’s design was inspired by the native Hawaiian culture to evoke sensory response and emotional experience while blending in with the overly urban character of modern-day Waikiki. The trellis system was easily installed and both MGA and Plas-Tech are very happy with the finished product. MGA Architecture was so pleased with Strongwell’s FRP structural shapes, they have plans to add five more trellis systems on the neighboring building. They will also use Strongwell components for another future project.

Project Summary: Waikiki Shopping Plaza, Waikiki, Hawaii

BUILDING TEAM
Architect: MGA Architectures
Fabricator: Plas-Tech Ltd.
Product: Strongwell EXTREN 2 x 6-½-in. rectangular tubes

EXTREN is a proprietary combination of fiberglass reinforcements and thermosetting polyester or vinyl ester resin systems. It is produced in more than 100 standard shapes and has a surface veil to protect against glass fibers penetrating the resin surface in service and to increase corrosion and UV resistance. The features of EXTREN include: corrosion resistant, Low Conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

The features of EXTREN include: corrosion resistant, low conductivity – thermally and electrically, non-magnetic – electromagnetic transparency, lightweight, high strength, dimensional stability, and low maintenance.

EXTREN is offered in three series designed for different environments and applications:

  • Series 500 – an all-purpose series utilizing an isophthalic polyester resin system with a UV inhibitor. Series 500 color is Olive Green
  • Series 525 – An all-purpose series utilizing a fire retardant isophthalic polyester resin system with a UV inhibitor. Series 525 color is Slate Gray (plus certain handrail and fixed ladder components in yellow)
  • Series 625 - A premium series both fire retardant and highly corrosion resistant utilizing a vinyl ester resin system with a UV inhibitor. Series 625 color is Beige

For more information, contact Strongwell at 276-645-8000, webmaster@strongwell.com or visit www.strongwell.com. BD+C

Related Stories

Industry Research | Jan 23, 2024

Leading economists forecast 4% growth in construction spending for nonresidential buildings in 2024

Spending on nonresidential buildings will see a modest 4% increase in 2024, after increasing by more than 20% last year according to The American Institute of Architects’ latest Consensus Construction Forecast. The pace will slow to just over 1% growth in 2025, a marked difference from the strong performance in 2023.

Giants 400 | Jan 23, 2024

Top 110 Medical Office Building Architecture Firms for 2023

SmithGroup, CannonDesign, E4H Environments for Health Architecture, and Perkins Eastman top BD+C's ranking of the nation's largest medical office building architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

Giants 400 | Jan 22, 2024

Top 100 Outpatient Facility Architecture Firms for 2023

HDR, CannonDesign, Stantec, Perkins&Will, and ZGF top BD+C's ranking of the nation's largest outpatient facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to outpatient medical buildings, including cancer centers, heart centers, urgent care facilities, and other medical centers.

Construction Costs | Jan 22, 2024

Construction material prices continue to normalize despite ongoing challenges

Gordian’s most recent Quarterly Construction Cost Insights Report for Q4 2023 describes an industry still attempting to recover from the impact of COVID. This was complicated by inflation, weather, and geopolitical factors that resulted in widespread pricing adjustments throughout the construction materials industries.

Transit Facilities | Jan 22, 2024

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

Hotel Facilities | Jan 22, 2024

U.S. hotel construction is booming, with a record-high 5,964 projects in the pipeline

The hotel construction pipeline hit record project counts at Q4, with the addition of 260 projects and 21,287 rooms over last quarter, according to Lodging Econometrics.

Modular Building | Jan 19, 2024

Virginia is first state to adopt ICC/MBI offsite construction standards

Virginia recently became the first state to adopt International Code Council/Modular Building Institute off-site construction standards.

Office Buildings | Jan 19, 2024

How to strengthen office design as employees return to work

Adam James, AIA, Senior Architect, Design Collaborative, shares office design tips for the increasingly dynamic workplace.

Modular Building | Jan 19, 2024

Building with shipping containers not as eco-friendly as it seems

With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.

Adaptive Reuse | Jan 18, 2024

Coca-Cola packaging warehouse transformed into mixed-use complex

The 250,000-sf structure is located along a now defunct railroad line that forms the footprint for the city’s multi-phase Beltline pedestrian/bike path that will eventually loop around the city.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021