flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC


By HGA | March 15, 2013

 

HGA Architects and Engineers (HGA) has hired Rolf Haarstad, AIA, LEED AP, as associate vice president and healthcare principal in the Washington, D.C. office. He will help build the healthcare practice group in the mid-Atlantic region, lead design teams, and manage new and existing client relations.
 
“Rolf has extensive experience in healthcare planning and design,” said Kurt Spiering, AIA, ACHA, vice president and healthcare market sector leader at HGA. “Having served as a board member for a major healthcare provider and principal of his own firm, he brings a holistic approach to healthcare design from both the architect and client perspective. He understands the strategic business implications facility planning has on the healthcare industry, and he equally understands the tools necessary to organize integrated project teams that address clients’ business needs. Rolf’s leadership will be instrumental as we continue to strengthen our healthcare design services throughout the East Coast.”
 
Haarstad has more than 25 years of architectural experience, with the last 12 years focused on healthcare. He currently is working on the Northwestern Lake Forest Replacement Hospital, which is part of a multi-phase revitalization master plan on a 161-acre healthcare campus in Lake Forest, Illinois. 
 
Before joining HGA, Haarstad was a healthcare principal with Hord Coplan Macht, Inc., in Baltimore, where he worked for such clients as Western Maryland Health System, LifeBridge Health, Bon Secours Baltimore Health System, and Maryland General Hospital. Previously he was founding principal of Xerxes Architects, an eight-person studio specializing in commercial work in Minneapolis. 
 
“HGA promotes a rigorous, knowledge-based design process that translates into forward-thinking architecture for our clients,” Haarstad said. “The healthcare industry is constantly evolving through changes in technology, demographics, delivery methods, and reimbursements. HGA sets high design standards that address these industry changes and anticipate future changes. I am excited to be part of a team that researches facility solutions that enable our clients to deliver excellent healthcare to their communities.”
 
ABOUT HGA 
HGA is an integrated architecture, engineering and planning firm that helps prepare its clients for the future. With offices in Minneapolis and Rochester, Minnesota; Milwaukee, Wisconsin; Los Angeles, San Francisco and Sacramento, California; and Washington D.C., the nationally recognized firm has developed expertise in the healthcare, corporate, government, arts, community, education, and science/technology industries since 1953. HGA’s culture for interdisciplinary collaboration, knowledge sharing and design investigation enables its clients to achieve success with responsive, innovative and sustainable design. Visit www.HGA.com or follow the firm on Facebook or Twitter.
 

Tags

Related Stories

| Dec 2, 2014

SPARK designs urban farming housing for Singapore’s elderly population

The proposal blends affordable retirement housing with urban farming by integrating vertical aquaponic farming and rooftop soil planting into multi-unit housing for seniors.

| Dec 2, 2014

Bjarke Ingels unveils cave-like plan for public square in Battersea Power Station

A Malaysian development consortium is guiding the project, which is meant to mimic the caves of Gunung Mulu National Park in Sarawak, East Malaysia. 

| Dec 1, 2014

9 most controversial buildings ever: ArchDaily report

Inexplicable designs. Questionable functionality. Absurd budgeting. Just plain inappropriate. These are some of the characteristics that distinguish projects that ArchDaily has identified as most controversial in the annals of architecture and construction. 

| Dec 1, 2014

Skanska, Foster + Partners team up on development of first commercial 3D concrete printing robot

Skanska will participate in an 18-month program with a consortium of partners to develop a robot capable of printing complex structural components with concrete. 

| Dec 1, 2014

How public-private partnerships can help with public building projects

Minimizing lifecycle costs and transferring risk to the private sector are among the benefits to applying the P3 project delivery model on public building projects, according to experts from Skanska USA. 

High-rise Construction | Dec 1, 2014

ThyssenKrupp develops world’s first rope-free elevator system

ThyssenKrupp's latest offering, named MULTI, will allow several cabins in the same shaft to move vertically and horizontally.

| Nov 29, 2014

20 tallest towers that were never completed

Remember the Chicago Spire? What about Russia Tower? These are two of the tallest building projects that were started, but never completed, according to the Council on Tall Buildings and Urban Habitat. The CTBUH Research team offers a roundup of the top 20 stalled skyscrapers across the globe.

| Nov 26, 2014

USITT Selects Bahrain National Theatre for Honor Award

The Bahrain National Theatre will be recognized with an Honor Award by the United States Institute for Theatre Technology (USITT) in 2015. 

| Nov 26, 2014

How the 'maker culture' brings the power of design to life

Most people affiliate the maker culture with metal working, welding, ceramics, glass blowing, painting, and soldering. But it also includes coding and online content creation, writes Gensler’s Douglas Wittnebel.

| Nov 26, 2014

U.S. Steel decides to stay in Pittsburgh, plans new HQ near Penguins arena

The giant steelmaker has agreed to move into a new headquarters that is slated to be part of a major redevelopment.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021