flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC


By HGA | March 15, 2013

 

HGA Architects and Engineers (HGA) has hired Rolf Haarstad, AIA, LEED AP, as associate vice president and healthcare principal in the Washington, D.C. office. He will help build the healthcare practice group in the mid-Atlantic region, lead design teams, and manage new and existing client relations.
 
“Rolf has extensive experience in healthcare planning and design,” said Kurt Spiering, AIA, ACHA, vice president and healthcare market sector leader at HGA. “Having served as a board member for a major healthcare provider and principal of his own firm, he brings a holistic approach to healthcare design from both the architect and client perspective. He understands the strategic business implications facility planning has on the healthcare industry, and he equally understands the tools necessary to organize integrated project teams that address clients’ business needs. Rolf’s leadership will be instrumental as we continue to strengthen our healthcare design services throughout the East Coast.”
 
Haarstad has more than 25 years of architectural experience, with the last 12 years focused on healthcare. He currently is working on the Northwestern Lake Forest Replacement Hospital, which is part of a multi-phase revitalization master plan on a 161-acre healthcare campus in Lake Forest, Illinois. 
 
Before joining HGA, Haarstad was a healthcare principal with Hord Coplan Macht, Inc., in Baltimore, where he worked for such clients as Western Maryland Health System, LifeBridge Health, Bon Secours Baltimore Health System, and Maryland General Hospital. Previously he was founding principal of Xerxes Architects, an eight-person studio specializing in commercial work in Minneapolis. 
 
“HGA promotes a rigorous, knowledge-based design process that translates into forward-thinking architecture for our clients,” Haarstad said. “The healthcare industry is constantly evolving through changes in technology, demographics, delivery methods, and reimbursements. HGA sets high design standards that address these industry changes and anticipate future changes. I am excited to be part of a team that researches facility solutions that enable our clients to deliver excellent healthcare to their communities.”
 
ABOUT HGA 
HGA is an integrated architecture, engineering and planning firm that helps prepare its clients for the future. With offices in Minneapolis and Rochester, Minnesota; Milwaukee, Wisconsin; Los Angeles, San Francisco and Sacramento, California; and Washington D.C., the nationally recognized firm has developed expertise in the healthcare, corporate, government, arts, community, education, and science/technology industries since 1953. HGA’s culture for interdisciplinary collaboration, knowledge sharing and design investigation enables its clients to achieve success with responsive, innovative and sustainable design. Visit www.HGA.com or follow the firm on Facebook or Twitter.
 

Tags

Related Stories

| Aug 30, 2013

Modular classrooms gaining strength with school boards

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.

| Aug 30, 2013

Local Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 30, 2013

A new approach to post-occupancy evaluations

As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects. 

| Aug 29, 2013

First look: K-State's Bill Snyder Family Stadium expansion

The West Side Stadium Expansion Project at Kansas State's Bill Snyder Family Stadium is the largest project in K-State Athletics history. 

| Aug 27, 2013

Industrial Sector Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest industrial sector design and construction firms, as reported in the 2013 Giants 300 Report.

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 26, 2013

Chicago Bears kick off season at renovated Halas Hall

An upgraded locker room, expanded weight room, and updated dining room with an outdoor patio greeted the Chicago Bears when they arrived at Halas Hall for practice this month. The improvements are part of a major expansion and renovation of the Bears’ headquarters in Lake Forest, Ill., completed by Mortenson Construction in less than seven months.

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 22, 2013

Warehouse remake: Conversion project turns derelict freight terminal into modern office space [slideshow]

The goal of the Freight development is to attract businesses to an abandoned industrial zone north of downtown Denver.

| Aug 21, 2013

AIA: Architecture billings on the rise in July

The Architecture Billings Index for July was 52.7, up from a mark of 51.6 in June. This score reflects an increase in demand for design services (any score above 50 indicates an increase in billings).

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021