flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC


By HGA | March 15, 2013

 

HGA Architects and Engineers (HGA) has hired Rolf Haarstad, AIA, LEED AP, as associate vice president and healthcare principal in the Washington, D.C. office. He will help build the healthcare practice group in the mid-Atlantic region, lead design teams, and manage new and existing client relations.
 
“Rolf has extensive experience in healthcare planning and design,” said Kurt Spiering, AIA, ACHA, vice president and healthcare market sector leader at HGA. “Having served as a board member for a major healthcare provider and principal of his own firm, he brings a holistic approach to healthcare design from both the architect and client perspective. He understands the strategic business implications facility planning has on the healthcare industry, and he equally understands the tools necessary to organize integrated project teams that address clients’ business needs. Rolf’s leadership will be instrumental as we continue to strengthen our healthcare design services throughout the East Coast.”
 
Haarstad has more than 25 years of architectural experience, with the last 12 years focused on healthcare. He currently is working on the Northwestern Lake Forest Replacement Hospital, which is part of a multi-phase revitalization master plan on a 161-acre healthcare campus in Lake Forest, Illinois. 
 
Before joining HGA, Haarstad was a healthcare principal with Hord Coplan Macht, Inc., in Baltimore, where he worked for such clients as Western Maryland Health System, LifeBridge Health, Bon Secours Baltimore Health System, and Maryland General Hospital. Previously he was founding principal of Xerxes Architects, an eight-person studio specializing in commercial work in Minneapolis. 
 
“HGA promotes a rigorous, knowledge-based design process that translates into forward-thinking architecture for our clients,” Haarstad said. “The healthcare industry is constantly evolving through changes in technology, demographics, delivery methods, and reimbursements. HGA sets high design standards that address these industry changes and anticipate future changes. I am excited to be part of a team that researches facility solutions that enable our clients to deliver excellent healthcare to their communities.”
 
ABOUT HGA 
HGA is an integrated architecture, engineering and planning firm that helps prepare its clients for the future. With offices in Minneapolis and Rochester, Minnesota; Milwaukee, Wisconsin; Los Angeles, San Francisco and Sacramento, California; and Washington D.C., the nationally recognized firm has developed expertise in the healthcare, corporate, government, arts, community, education, and science/technology industries since 1953. HGA’s culture for interdisciplinary collaboration, knowledge sharing and design investigation enables its clients to achieve success with responsive, innovative and sustainable design. Visit www.HGA.com or follow the firm on Facebook or Twitter.
 

Tags

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021