flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC


By HGA | March 15, 2013

 

HGA Architects and Engineers (HGA) has hired Rolf Haarstad, AIA, LEED AP, as associate vice president and healthcare principal in the Washington, D.C. office. He will help build the healthcare practice group in the mid-Atlantic region, lead design teams, and manage new and existing client relations.
 
“Rolf has extensive experience in healthcare planning and design,” said Kurt Spiering, AIA, ACHA, vice president and healthcare market sector leader at HGA. “Having served as a board member for a major healthcare provider and principal of his own firm, he brings a holistic approach to healthcare design from both the architect and client perspective. He understands the strategic business implications facility planning has on the healthcare industry, and he equally understands the tools necessary to organize integrated project teams that address clients’ business needs. Rolf’s leadership will be instrumental as we continue to strengthen our healthcare design services throughout the East Coast.”
 
Haarstad has more than 25 years of architectural experience, with the last 12 years focused on healthcare. He currently is working on the Northwestern Lake Forest Replacement Hospital, which is part of a multi-phase revitalization master plan on a 161-acre healthcare campus in Lake Forest, Illinois. 
 
Before joining HGA, Haarstad was a healthcare principal with Hord Coplan Macht, Inc., in Baltimore, where he worked for such clients as Western Maryland Health System, LifeBridge Health, Bon Secours Baltimore Health System, and Maryland General Hospital. Previously he was founding principal of Xerxes Architects, an eight-person studio specializing in commercial work in Minneapolis. 
 
“HGA promotes a rigorous, knowledge-based design process that translates into forward-thinking architecture for our clients,” Haarstad said. “The healthcare industry is constantly evolving through changes in technology, demographics, delivery methods, and reimbursements. HGA sets high design standards that address these industry changes and anticipate future changes. I am excited to be part of a team that researches facility solutions that enable our clients to deliver excellent healthcare to their communities.”
 
ABOUT HGA 
HGA is an integrated architecture, engineering and planning firm that helps prepare its clients for the future. With offices in Minneapolis and Rochester, Minnesota; Milwaukee, Wisconsin; Los Angeles, San Francisco and Sacramento, California; and Washington D.C., the nationally recognized firm has developed expertise in the healthcare, corporate, government, arts, community, education, and science/technology industries since 1953. HGA’s culture for interdisciplinary collaboration, knowledge sharing and design investigation enables its clients to achieve success with responsive, innovative and sustainable design. Visit www.HGA.com or follow the firm on Facebook or Twitter.
 

Tags

Related Stories

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

| Oct 5, 2011

GREENBUILD 2011: Software an architectural game changer

Interactive modeling software transforms the design­build process. 

| Oct 5, 2011

GREENBUILD 2011: Tile manufacturer attains third-party certification for waste recycling processes

Crossville has joined with TOTO to recycle that company’s pre-consumer fired sanitary ware.

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

| Oct 5, 2011

GREENBUILD 2011: Solar PV canopy system expanded for architectural market

Turnkey systems create an aesthetic architectural power plant. 

| Oct 5, 2011

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011

In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, exhibitor highlights its new products with ecological awareness. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021