flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC

HGA hires Rolf Haarstad as Associate VP, healthcare principal in DC


By HGA | March 15, 2013

 

HGA Architects and Engineers (HGA) has hired Rolf Haarstad, AIA, LEED AP, as associate vice president and healthcare principal in the Washington, D.C. office. He will help build the healthcare practice group in the mid-Atlantic region, lead design teams, and manage new and existing client relations.
 
“Rolf has extensive experience in healthcare planning and design,” said Kurt Spiering, AIA, ACHA, vice president and healthcare market sector leader at HGA. “Having served as a board member for a major healthcare provider and principal of his own firm, he brings a holistic approach to healthcare design from both the architect and client perspective. He understands the strategic business implications facility planning has on the healthcare industry, and he equally understands the tools necessary to organize integrated project teams that address clients’ business needs. Rolf’s leadership will be instrumental as we continue to strengthen our healthcare design services throughout the East Coast.”
 
Haarstad has more than 25 years of architectural experience, with the last 12 years focused on healthcare. He currently is working on the Northwestern Lake Forest Replacement Hospital, which is part of a multi-phase revitalization master plan on a 161-acre healthcare campus in Lake Forest, Illinois. 
 
Before joining HGA, Haarstad was a healthcare principal with Hord Coplan Macht, Inc., in Baltimore, where he worked for such clients as Western Maryland Health System, LifeBridge Health, Bon Secours Baltimore Health System, and Maryland General Hospital. Previously he was founding principal of Xerxes Architects, an eight-person studio specializing in commercial work in Minneapolis. 
 
“HGA promotes a rigorous, knowledge-based design process that translates into forward-thinking architecture for our clients,” Haarstad said. “The healthcare industry is constantly evolving through changes in technology, demographics, delivery methods, and reimbursements. HGA sets high design standards that address these industry changes and anticipate future changes. I am excited to be part of a team that researches facility solutions that enable our clients to deliver excellent healthcare to their communities.”
 
ABOUT HGA 
HGA is an integrated architecture, engineering and planning firm that helps prepare its clients for the future. With offices in Minneapolis and Rochester, Minnesota; Milwaukee, Wisconsin; Los Angeles, San Francisco and Sacramento, California; and Washington D.C., the nationally recognized firm has developed expertise in the healthcare, corporate, government, arts, community, education, and science/technology industries since 1953. HGA’s culture for interdisciplinary collaboration, knowledge sharing and design investigation enables its clients to achieve success with responsive, innovative and sustainable design. Visit www.HGA.com or follow the firm on Facebook or Twitter.
 

Tags

Related Stories

| Dec 17, 2010

Luxury condos built for privacy

A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.

| Dec 17, 2010

Subway entrance designed to exude Hollywood charm

The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Dec 17, 2010

How to Win More University Projects

University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021