flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

HGA renovates Rowing Center at Cornell University

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.


By By BD+C Staff | December 19, 2011
The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower roo

The Cornell University Rowing teams have been on a winning streak recently. Since 2006, the men’s lightweight crew has won threeIRA (Intercollegiate Rowing Association) national championship crowns while the men’s heavyweight and women’s teams have medaled at national regattas and continued to improve their competitive standing.

Now the teams have an expanded Rowing Center to match their athletic gains.

Designed by HGA Architects and Engineers (HGA), Cornell’s updated Rowing Center overlooking Lake Cayuga in Ithaca, N.Y, repositions two existing boathouses into an advanced training facility that competes with the best in the nation.

Cornell’s crews include approximately 150 athletes on three teams—Men’s Heavyweight, Men’s Lightweight, and Women’s. The rowing facility had consisted of the two-story, 15,000-square-foot Collyer Boathouse built in 1957 for the men’s teams, and the adjacent one-story, 5,000-square-foot Robison Boathouse built in 1979 for the women’s team.

While serving their purpose well over the years, the boathouses lacked the infrastructure to fully support the growing teams—especially compared to newer facilities by competitors. The women’s crew, for instance, had tripled since it became a varsity team in the 1970s, yet the locker rooms were one-third the size of the men’s. In addition, neither building had adequate boat storage or indoor training equipment, with the crews splitting training between the Cayuga Inlet and Teagle Hall Fitness Center.

Cornell conducted an earlier study that recommended razing the boathouses for a new facility. However, when funding sources weren't adequate for this plan, the college cut back and looked for other options. Working with HGA, Cornell was able to arrive at a solution that fit the needs of the school, the athletic department, and the crews.

The 31,360-square-foot renovation consists of a two-story addition housing separate locker rooms for the three teams, shower rooms,  laundry facility, a Tradition Room displaying crew memorabilia, and meeting spaces. It is connected to the Collyer Boathouse via a two-story entrance lobby with a second-floor bridge. An outdoor gathering space connects to the lobby.

Collyer’s second-floor has been converted to a multi-purpose training room with state-of-the-art exercise equipment and weightlifting stations. The first level houses boat storage, waterfront offices for coaches, a water safety room, and repair bay.

Robison Boathouse, meanwhile, was cleared of its outdated locker room and offices and now functions solely as rowing shell and equipment storage. Doors were added to the backside of both original buildings to allow the teams to load shell trailers for event travel from the parking lot. The new door at Collyer even allows the teams to pull a loaded trailer into the boat bay in December to streamline departures for winter training. A new launch storage building completes the set of three structures.

Throughout Collyer and the addition, large windows overlook the water and oversized graphics and bold red accents emphasize Big Red traditions. The locker rooms include off-the-shelf resin lockers customized with integral venting and on-demand heating to allow the staff to dry damp rowing gear overnight and exhaust odors fully within the locker.

Exterior upgrades work within the existing buildings’ style and massing. HGA replaced wooden doors with glass doors to open the interior to views of the water, replaced and reconfigured upper windows, repaired stonework, and added metal standing-seam roofs over the three structures to architecturally unify them and provide durable performance over the long term. The crisp existing color palette of nautical white paint, local bluestone accent panels and Cornell Red trim was restored and extended to the addition.

The site itself presented structural challenges due to the soft load-bearing soil conditions. With marginal soil-bearing capacity and bedrock far below affordable levels to reach with piers, HGA's team designed a system that pre-loaded the site to force settlement before pouring a three-foot-thick concrete-slab mat foundation for the addition. New structural framing for the addition cantilevers toward Collyer without actually bearing on the existing structure.

And while Collyer was structurally sound, HGA reinforced the joists on the second level to support increased capacity for the weight-lifting stations.

The project provides significant savings for the Athletic Department through a number of sustainable features, including an upgraded exterior envelope with added insulation and thermal-pane windows, energy-efficient fixtures, room occupancy sensors, lighting control systems, and an air-to-air heat exchanger to temper the high fresh air loads. In addition, the tight site integrates native plantings and pervious pavement to treat surface storm water and creates a right-of-way for the Cayuga Waterfront Trail, a public bike/pedestrian path.

Since its dedication this summer, the Rowing Center has proved a winner on all counts. The Athletic Department has a cost-efficient facility that provides effective training and team support, adds much-needed boat storage, upholds the University’s gender equity standards, preserves the heritage of the existing structures, and provides an outstanding environment for recruiting and alumni events.

HGA directed architecture, interior, structural, mechanical and electrical services. HGA’s project team included d’Andre Willis, AIA, principal and project manager; Loren Ahles, FAIA, project lead designer; Kendra Beaubien, AIA, project architect; Kevin Allebach, RA, project architect; Amy Tasch, LEED AP, interior designer; Sarah Jorczak, PE, structural engineer; Lance Kempf, PE, mechanical engineer; and Ben Gutierrez, electrical. The team also included Welliver McGuire, Inc., general contractor; CHA, civil engineer; and CHA, landscape architect. BD+C

Related Stories

Mass Timber | Jun 10, 2024

5 hidden benefits of mass timber design

Mass timber is a materials and design approach that holds immense potential to transform the future of the commercial building industry, as well as our environment. 

Lighting | Jun 10, 2024

LEDs were nearly half of the installed base of lighting products in the U.S. in 2020

Federal government research shows a huge leap in the penetration of LEDs in the lighting market from 2010 to 2020. In 2010 and 2015, LED installations represented 1% and 8% of overall lighting inventory, respectively. 

Libraries | Jun 7, 2024

7 ways to change 'business as usual': The Theodore Roosevelt Presidential Library

One hundred forty years ago, Theodore Roosevelt had a vision that is being realized today. The Theodore Roosevelt Presidential Library is a cutting-edge example of what’s possible when all seven ambitions are pursued to the fullest from the beginning and integrated into the design at every phase and scale.

Education Facilities | Jun 6, 2024

Studio Gang designs agricultural education center for the New York City Housing Authority

Earlier this month, the City of New York broke ground on the new $18.2 million Marlboro Agricultural Education Center (MAEC) at the New York City Housing Authority’s Marlboro Houses in Brooklyn. In line with the mission of its nonprofit operator, The Campaign Against Hunger, MAEC aims to strengthen food autonomy and security in underserved neighborhoods. MAEC will provide Marlboro Houses with diverse, community-oriented programs.

Office Buildings | Jun 6, 2024

HOK presents neurodiversity research and design guidelines at SXSW 2024

Workplace experts share insights on designing inclusive spaces that cater to diverse sensory processing needs.

Architects | Jun 4, 2024

HED and Larson Incitti Architects merge, combine Denver staff

HED, a leading national architecture and engineering firm, today announced a merger with award-winning, Denver-based Larson Incitti Architects (LIA). The merger combines LIA's staff with HED's Denver office, significantly expanding the local team and leveraging community relationships to create new opportunities across multiple market sectors.

Airports | Jun 3, 2024

SOM unveils ‘branching’ structural design for new Satellite Concourse 1 at O’Hare Airport

The Chicago Department of Aviation has revealed the design for Satellite Concourse 1 at O’Hare International Airport, one of the nation’s business airports. Designed by Skidmore, Owings & Merrill (SOM), with Ross Barney Architects, Juan Gabriel Moreno Architects (JGMA), and Arup, the concourse will be the first new building in the Terminal Area Program, the largest concourse area expansion and revitalization in the airport’s almost seven-decade history. 

Office Buildings | Jun 3, 2024

Insights for working well in a hybrid world

GBBN Principal and Interior Designer Beth Latto, NCIDQ, LEED AP, ID+C, WELL AP, share a few takeaways, insights, and lessons learned from a recent Post Occupancy Evaluation of the firm's Cincinnati, Ohio, office.

Multifamily Housing | Jun 3, 2024

Grassroots groups becoming a force in housing advocacy

A growing movement of grassroots organizing to support new housing construction is having an impact in city halls across the country. Fed up with high housing costs and the commonly hostile reception to new housing proposals, advocacy groups have sprung up in many communities to attend public meetings to speak in support of developments.

MFPRO+ News | Jun 3, 2024

New York’s office to residential conversion program draws interest from 64 owners

New York City’s Office Conversion Accelerator Program has been contacted by the owners of 64 commercial buildings interested in converting their properties to residential use.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021